Laserfiche WebLink
Attachment A <br />1 <br />TKDA. . <br />August 23, 2023 <br />Mr. David Swearingen, P.E. <br />Public Works Director / City Engineer <br />City of Arden Hills <br />1245 Paul Kirkwold Dr. <br />Arden Hills, Minnesota 55112 <br />Re: Proposal for Engineering Services <br />South Tower Improvements Project — PW-23-0107 <br />Dear Mr. Swearingen: <br />In response to your request, we propose to provide Engineering Services in connection with the South Tower <br />Improvements Project, City Project #PW-23-0107, in Arden Hills, MN hereinafter called the Project. Our services <br />will be provided in the manner described in this Proposal subject to the terms and conditions set forth in the attached <br />"General Provisions of Engineer -Architect Agreement" dated July 2009. Hereinafter, Arden Hills is referred to as <br />the CITY. <br />I. PROJECT DESCRIPTION <br />In the fall of 2022, the CITY contracted with Badger State Inspection, LLC (BSI) for inspection of the South Tower. <br />As part of that inspection, BSI recommended several improvements to the tower to extend the life of the existing <br />coating system. TKDA proposes to incorporate the recommended improvements into bidding documents. <br />The CITY is also considering security improvements to the South Tower site. These improvements include <br />perimeter fencing, security cameras, and improvements to better secure access points to the site and infrastructure. <br />TKDA will provide engineering design for the improvements and include the security improvements in the bidding <br />documents for the South Tower improvements. <br />II. SERVICES TO BE PROVIDED BY TKDA <br />Based on TKDA's understanding of the Project, we propose to provide the following services: <br />A. Project Management and Communications <br />1. Provide general Project Management of TKDA's services for the Project including communications, <br />maintain the Project work schedule, managing budgets, and invoicing. <br />2. Internal TKDA design meetings. <br />3. Attendance at two (2) City Council work sessions. <br />4. Regular status updates on project progress to the CITY. <br />B. QA/QC <br />1. Conduct internal QA/QC peer reviews during the course of the design. <br />C. Plans and Specifications <br />1. Onsite kick-off meeting and site review. <br />2. Complete a topographic survey of the South Tower site. <br />3. Develop 50% plans and cost estimate for improvements to the South Tower to include: <br />a. Structural repairs to bring the tank into compliance with AWWA standards. <br />b. Spot repairs to the interior wet costing. <br />c. Repairs to the interior dry coating. <br />d. Security improvements: <br />i. Security perimeter fencing with signage. <br />ii. Bollards for booster station generator. <br />iii. Bollards for West exterior water tower door. <br />iv. Replace plywood cover of lower -level access with lockable cover. <br />V. Card reader for site access control. <br />TKDA® 1 444 Cedar Street Suite 1500 1 Saint Paul, MN 55101 651.292.4400 • tkda.com <br />An employee -owned company promoting affirmative action and equal opportunity. <br />