Laserfiche WebLink
<br />. <br /> <br />I <br /> <br />9 <br /> <br />We have only shown a cost of landscaping in the median <br />islands in this area. We didn't show a cost even though we <br />show them on the picture and we didn't figure the cost in the <br />interim designs. We find that either of the concepts is a <br />feasible undertaking. <br /> <br />MAYOR CREPEAU: I'd like tQ, at this time, ask our fiscal <br />consultant, Mr. Popovich, to briefly explain the finances. <br /> <br />MR. POPOVICH: The published notice of the project was <br />rounded off to the total cost'of $630,000. The reaSOn we had <br />to have that'..figure is to have the highest figure that. you could <br />possibly go based on the engineer's estimates., '. <br />