My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-09-23-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
10-09-23-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2023 2:58:52 PM
Creation date
10/9/2023 2:57:08 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Discussion <br />City Council is to discuss the addition of a City owned and operated speed display sign along <br />LJB near Sandeen Rd and Stowe Ave. With Council direction, City staff would begin the <br />permitting process with Ramsey County and purchase the necessary equipment. The City would <br />need to hire a contractor for installation of the sign due to traffic control requirements. <br />Budget Impact <br />The implementation of the speed display sign is anticipated to be 100% city cost. <br />Speed display sign $4,000 <br />Installation $1,000 <br />Estimated Total $5,000 <br />Replacement batteries and other components must be purchased through the same vendor. Each <br />unit contains 4 batteries, each battery costs about $200 and they will typically need to be <br />replaced every 3 - 5 years. <br />Attachments <br />N/A <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.