Laserfiche WebLink
work required to construct a long-term reliable pavement surface. Olson Engineering has <br />provided a proposal in Attachment A. Staff has visited with the consultant on site and reviewed <br />the proposal. City staff recommends Council approve the quote to investigate the subsurface for <br />the rubber tire layer. <br />Budget Imbact <br />The City's CIP has $300,000 budgeted for the total cost of the Hazelnut Parking Lot project, it is <br />assumed the Church will cover a portion of those costs but that portion is yet to be determined. <br />The additional geophysical subsurface investigation was not included in City Staff s estimation <br />for this project. Staff does not recommend adjusting the budgeted amount at this time but to wait <br />until the findings from the proposed work are available. <br />Attachments <br />Attachment A: Olson Engineering proposal and quote <br />Page 2 of 2 <br />