My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-23-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
10-23-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2023 1:46:33 PM
Creation date
10/19/2023 1:42:57 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
work required to construct a long-term reliable pavement surface. Olson Engineering has <br />provided a proposal in Attachment A. Staff has visited with the consultant on site and reviewed <br />the proposal. City staff recommends Council approve the quote to investigate the subsurface for <br />the rubber tire layer. <br />Budget Imbact <br />The City's CIP has $300,000 budgeted for the total cost of the Hazelnut Parking Lot project, it is <br />assumed the Church will cover a portion of those costs but that portion is yet to be determined. <br />The additional geophysical subsurface investigation was not included in City Staff s estimation <br />for this project. Staff does not recommend adjusting the budgeted amount at this time but to wait <br />until the findings from the proposed work are available. <br />Attachments <br />Attachment A: Olson Engineering proposal and quote <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.