My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-13-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
11-13-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 12:08:33 AM
Creation date
11/14/2023 2:33:42 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT ITEM— 8I <br /> ,-AI�EN HILLS <br /> MEMORANDUM <br /> DATE: November 13, 2023 <br /> TO: Honorable Mayor and City Councilmembers <br /> Dave Perrault, City Administrator <br /> FROM: David Swearingen, P.E. Public Works Director/City Engineer <br /> SUBJECT: Trunk Watermain Improvements - Roseville <br /> Budgeted Amount: Actual Amount: Funding Source: <br /> $385,000 $TBD Water Utility Fund <br /> Council Should Consider <br /> Motions to approve, table, or deny the following: <br /> • Construction Cooperative Agreement for Construction of Watermain on Hamline <br /> Avenue with the City of Roseville. <br /> Background/Discussion <br /> Project area is shown in Exhibit A and Exhibit B within the Cooperative Agreement (Attachment <br /> A). Arden Hills has a 16-inch diameter trunk watermain that extends from Roseville at Hamline <br /> Avenue and Glenhill Rd that feeds both water towers. Within Roseville there is an existing 12- <br /> inch watennain that connects to the Arden Hill's 16-inch watermain. The existing conditions are <br /> adequate for Arden Hill's current demand for water but the purpose of this project is to upgrade <br /> the watennain within Roseville from 12-inch to 16-inch to supply the required water demand for <br /> future development at Rice Creek Commons/TCAAP. This project is anticipated to be <br /> constructed in 2024. The timing is due to coordination with Ramsey County's pavement <br /> rehabilitation project along Hamline Avenue in 2025. Ramsey County requested that the work be <br /> completed prior to their project so the new pavement is not disturbed. <br /> Budget Impact <br /> The 2024 CIP has $385,000 budgeted for this project(Attachment B). Because Roseville does <br /> not have a need to replace or upgrade this segment of watermain for their City needs, the costs <br /> related to upsizing the pipe, valves, fittings, meter manhole and related restoration will be fully <br /> funded by Arden Hills per the attached Cooperative Agreement. Roseville has offered to take the <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.