My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-27-23-SWS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
11-27-23-SWS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2023 4:04:30 PM
Creation date
11/22/2023 4:02:24 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In the B-3 zoning district, proposals for new construction, redevelopment of a site, and <br />significant modifications to existing sites shall use the Planned Unit Development (PUD) <br />process. A PUD promotes the development of land in a unified manner by treating the entire <br />development as a single entity. The purpose of the PUD process is to achieve a higher quality <br />and better project than would otherwise be possible if the strict application of the zoning and <br />subdivision requirements were met. <br />The Subject Property is guided as Commercial (COM) in the Arden Hills 2040 Comprehensive <br />Plan Land Use Chapter. The area is designated for a broad range of retail, shopping, and services <br />to meet the needs of the community and region. Compatible uses such as office buildings are <br />also intended for this area. A development intensity of intensity of up to 0.8 FAR may be <br />allowed. <br />Direction <br />2040 Comp. Plan Land Use <br />Zoning <br />Existing Land Uses <br />North <br />COM - Commercial <br />B-3 Service Business District <br />Service Station/Retail/Mixed- <br />Use, Multi -tenant Buildings <br />Vacant Pace Industries Site <br />South <br />COM - Commercial <br />B-3 Service Business District <br />and Retail/Grocery Store <br />West <br />CMU - Community Mixed <br />B-4 Retail Center District <br />Retail and Other Commercial <br />Use <br />Uses <br />Discussion <br />Concept Plan Proposal <br />The Applicant has provided a conceptual site plan and example elevations and renderings of the <br />proposed redevelopment. From staff s initial review of the concept site plan it does appear that <br />setback requirements for the B-3 District and parking have been met. However, it should be <br />noted that in Section 1325.05 Subd. 8, E it states "at least fifty percent (50%) of the largest <br />building on each site shall be constructed at the front setback line." The proposed building <br />positioning is approximately 75 feet. <br />City code requires at least 75% of the exterior building materials should be made of brick <br />masonry, tile masonry, natural stone or its synthetic equivalent, decorative concrete plank, <br />transparent glass or any combination thereof. Trim and other accent or decorative features may <br />be metal, wood, split faced block, EIFS, or stucco. Undesirable materials include simulated <br />brick, vinyl or aluminum siding, sheet or corrugated metal siding, plain concrete blocks or <br />panels, brightly colored metal roofing or canopies, pre -cast tilt -up walls, and mirrored or <br />reflective glass. Additionally, businesses within the B-3 District for transparency requirements <br />shall have 50% of all first level building fagades that front a public street comprised of <br />transparent windows or doors in order to allow views of interior uses and activities. <br />The Applicant as part of the concept review has not provided the specific detail on percentage of <br />building materials or transparency. Their narrative indicates that flexibility would not be <br />requested for exterior materials, but may be sought for transparency requirements and signage. <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.