My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-23-WS
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
12-18-23-WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2023 11:01:51 AM
Creation date
12/14/2023 11:00:33 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South Tower Improvements <br />Memorandum <br />December 11, 2023 <br />Page 4 <br />3 - Replace the existing obstruction light on the top of the tower with a new LED light and increase the height of <br />the light to 10-ft above the tower roof and above the tallest antenna (Photo 3). <br />Photo 3 — Obstruction Light to be replaced (Photo by BSI) <br />Spot Repairs to Interior Wet Coating <br />The interior wet area coating is currently in fair to good condition. The coating is now 10 years old, and because <br />of its age is considered repairable. There are coating failures on the following surfaces that are included for repair: <br />• Roof over lapped plate seams and rafters <br />• Painter's T-Rails <br />• Top shell course <br />• Drywell tube, an approximate 5-foot band around the tube located around 30' from the floor <br />• Approximately 200 minor coating failures <br />The defective areas (rusted spots) will be spot blasted and coated with a new zinc primer and a 2-coat epoxy <br />system. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.