Laserfiche WebLink
South Tower Improvements <br />Memorandum <br />December 11, 2023 <br />Page 8 <br />Contingency as used in this EOPC represents an allowance to cover unknown conditions that are not possible to <br />be adequately defined from the information at the time it is prepared but must be accounted for by a sufficient cost <br />to reasonably cover the foreseeable issues. Contingency is a part of the defined project scope and is not used to <br />account for future project scope or schedule changes. <br />XXX XXX <br />Document3 <br />I <br />