Laserfiche WebLink
<br />ARDEN HILLS CITY COUNCIL - FEBRUARY 26,2001 <br /> <br />4 <br /> <br />. <br /> <br />· Alternating (offset) panel attachment to the posts; and <br />· Use of the dark chocolate brown stain color. <br /> <br />The Council also directed staff to request the Arden Manor Park owners to inform mobile home <br />park residents of the proposed noise wall project. <br /> <br />Mr. Post stated Mr. Gedstad, MnDOT Project Engineer, had previously indicated that there <br />would be aesthetic treatment upcharges to the City for decorative trim ($9,000.00), concrete post <br />endcaps ($12,250.00), and integral colored concrete posts ($104,085.00). MnDOT had since <br />indicated they would provide the decorative trim at no cost to the City. The Arden Manor Park <br />owners issued a February 1, 2001 letter to park residents informing them of the proposed noise <br />wall and informing them to forward comments to the City by February 16,2001. To date, the <br />City had only received one comment about the project and that was in support of the project. <br />Staff recommended the City adopt the resolution. <br /> <br />Councilmember Rem asked for clarification regarding the decorative trim. Mr. Post replied the <br />State would charge for the posts and endcaps, but not the decorative trim. <br /> <br />MOTION: <br /> <br />Councilmember Grant moved and Councilmember Aplikowski seconded a motion <br />to adopt Resolution No. 01-07, A Resolution Approving the Minnesota <br />Department of Transportation Proposal (S.P. 6284-130) to Construct a Noise Wall <br />on the East Side ofI-35W from C.S.A.H. 96 to Railroad Overpass. The motion <br />carried unanimously (5-0). <br /> <br />. <br /> <br />AI. Case #01-01, Corporate Express, 1233 West County Road E, Site Plan Review <br /> <br />Mr. Lynch explained that the applicant, Corporate Express, was requesting a site plan review of <br />the existing facility at 1233 W. County Road E, for additional dock doors on the west side of the <br />building, a dock addition on the north side of the building and a revised parking plan to <br />accommodate interior and exterior remodeling. <br /> <br />Mr. Lynch reviewed the past planning cases for the Corporate Express property. He noted that <br />Planning Case 69-23 reviewed two variances for this property: rear yard setback (18' where 20' <br />was required for overall expansion; allowing as close as 2' for the NE corner of the structure) and <br />building coverage (47% where 40% was the maximum permitted). The applications were <br />unanimously approved and, therefore, any variances approved with this structure, remain a part <br />of the property until which time that the building was removed. There were a number of existing <br />issues with this property, greatly the result of variances granted in the past, hindering future <br />expansion and reasonable attempts by the applicant to bring the property into conformance. <br /> <br />Mr. Lynch presented the site plan as follows: <br /> <br />. <br /> <br />1. Building Setbacks. The proposed dock addition on the north side of the building was shown <br />at 16' from the rear property line. It must be no closer than 18' to be in conformance with <br />variance #69-23. <br />