Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br /> <br />.ARDEN HILLS CITY COUNCIL - FEBRUARY 27. 1995 <br /> <br />q <br /> <br />NATIONAL GUARD WATER/SEWER CONNECTION REQUEST <br /> <br />Superintendent Winkel indicated staff has reviewed the Melchert/Block Associates proposed <br />Sanitary Sewer and Water plans for the National Guard Reserve Center. <br /> <br />Mr. Winkel stated after examining the available Sanitary Sewer connections, staff has developed <br />an alternate to the Melchert/Block proposal. He noted Alternate B, as described in the February <br />6, 1995 letter from City Engineer Greg Stonehouse is the staff recommended connection method. <br /> <br />Mr. Winkel indicated the estimated cost for installing the staff recommended connection should <br />be very close to the Melchert/Block proposed plans expenditure. <br /> <br />Mr. Winkel stated as noted in Mr. Stonehouse's letter Alternate B will have the least amount of <br />restoration needed on Ham1ine Avenue, with the water connection work taking place off the <br />main roadway. The staff recommended water main connection should be a 12-inch size pipe <br />jacked under County Highway 96 to maximize water available. <br /> <br />Mr. Winkel noted staff has met with Mr. Bill Block from Melchert/ Block to discuss the alternate <br />B plans. Mr. Block has agreed the Alternate B is feasible and is preparing plans and specifications <br />for this proposal. <br /> <br />Mr. Winkel indicated if Council agrees, he would like Council to direct staff to negotiate a <br />connection agreement between the National Guard Reserve and Arden Hills. <br /> <br />Mr. Bill Block of Melchert/Block Associates, indicated he had wanted to be assured that <br />connection could be made before expenditures had been made. <br /> <br />Acting Mayor Malone inquired if the costs have been estimated yet. Mr. Block indicated the cost <br />is still unsure, because of moving the lift station and other extra costs. <br /> <br />Mr. Stonehouse indicated there would not be a need for much oversizing. <br /> <br />Councilmember Hicks inquired as to the size of the piping. Mr. Stonehouse indicated it was their <br />opinion a 12-inch would be appropriate. <br /> <br />Councilmember Hicks inquired if this is proposed for current needs and if development occurs, <br />changing later. Mr. Stonehouse indicated the change would be to increase lift stations. <br /> <br />Mr. Fritsinger also indicated in reviewing the area south of Sunfish Lake and small area north of <br />the National Guard, there may not be a need for any changes for oversizing. <br />