Laserfiche WebLink
PRELIMINARY ENGINEER'S ESTIMATE <br />2024 PMP STREET & UTILITY IMPROVEMENTS <br />CITY OF ARDEN HILLS, MINNESOTA <br />BMI PROJECT NO. OT1.130168 <br />SCHEDULE "A" - BASE BID <br />ITEM <br />NO. <br />1 <br />SPEC.REF <br />2021.501 <br />DESCRIPTION <br />MOBILIZATION <br />NOTES <br />UNIT <br />LUMP SUM <br />STREET <br />0.32 <br />RECLAMATION <br />STORM <br />0.12 <br />AREAS <br />SANITARY <br />0.04 <br />WATER <br />0.07 <br />STREET <br />0.17 <br />MILL & OVERLAY <br />STORM <br />0.15 <br />AREAS <br />SANITARY <br />0,02 <br />WATER <br />0.01 <br />TRAJL & POND <br />0.10 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1.00 <br />ESTIMATED <br />UNIT PRICE <br />$100,000.00 <br />ESTIMATED TOTAL <br />PRICE <br />$ 100,000.00 <br />2 <br />2101.502 <br />CLEARING <br />EACH <br />0 <br />0 <br />0 <br />0 <br />0 <br />40 <br />0 <br />0 <br />0 <br />40.00 <br />$700.00 <br />$ 28,000.00 <br />3 <br />2101.502 <br />GRUBBING <br />EACH <br />0 <br />0 <br />0 <br />0 <br />0 <br />40 <br />0 <br />0 <br />0 <br />40.00 <br />$250.00 <br />$ 10,000.00 <br />4 <br />2104.502 <br />REMOVE CASTING <br />EACH <br />0 <br />44 <br />0 <br />0 <br />0 <br />28 <br />0 <br />0 <br />0 <br />72.00 <br />$160.00 <br />$ 11,520.00 <br />5 <br />2104.502 <br />REMOVE GATE VALVE & BOX <br />EACH <br />0 <br />0 <br />0 <br />3 <br />0 <br />0 <br />0 <br />4 <br />0 <br />7.00 <br />$350.00 <br />$ 2,450.00 <br />6 <br />2104.502 <br />REMOVE VALVE BOX <br />(1) <br />EACH <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />4 <br />0 <br />4.00 <br />$350.00 <br />$ 1,400.00 <br />7 <br />2104.502 <br />REMOVE HYDRANT <br />EACH <br />0 <br />0 <br />0 <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1.00 <br />$600.00 <br />$ 600.00 <br />8 <br />2104.502 <br />REMOVE DRAINAGE STRUCTURE <br />EACH <br />0 <br />2 <br />0 <br />0 <br />0 <br />11 <br />0 <br />0 <br />0 <br />13.00 <br />$550.00 <br />$ 7,150.00 <br />9 <br />2104.502 <br />REMOVE SIGN <br />EACH <br />5 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />5.00 <br />$40.00 <br />$ 200.00 <br />10 <br />2104.502 <br />SALVAGE MAILBOX SUPPORT <br />(2) <br />EACH <br />6 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />6.00 <br />$110.00 <br />$ 660.00 <br />11 <br />2104.503 <br />SAWING CONCRETE PAVEMENT (FULL DEPTH) <br />LIN FT <br />147 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />147.00 <br />$6.00 <br />$ 882.00 <br />12 <br />2104.503 <br />SAWING BITUMINOUS PAVEMENT (FULL DEPTH) <br />LIN FT <br />42 <br />0 <br />0 <br />0 <br />420 <br />0 <br />0 <br />0 <br />0 <br />462.00 <br />$4.00 <br />$ 1,848.00 <br />13 <br />2104.503 <br />REMOVE WATERMAIN <br />LIN FT <br />0 <br />0 <br />0 <br />667 <br />0 <br />0 <br />0 <br />0 <br />0 <br />667.00 <br />$8.00 <br />$ 5,336.00 <br />14 <br />2104.503 <br />REMOVE SEWER PIPE (STORM) <br />LIN FT <br />0 <br />116 <br />0 <br />0 <br />0 <br />20 <br />0 <br />0 <br />0 <br />136.00 <br />$15.00 <br />$ 2,040.00 <br />15 <br />2104.503 <br />REMOVE CURB & GUTTER <br />LIN FT <br />0 <br />0 <br />0 <br />816.76 <br />0 <br />0 <br />0 <br />83.24 <br />0 <br />900.00 <br />$3.00 <br />$ 2,700.00 <br />16 <br />2104.503 <br />REMOVE CURB & GUTTER (SPOT) <br />(3) <br />LIN FT <br />1666.16 <br />0 <br />0 <br />0 <br />1349.84 <br />0 <br />0 <br />0 <br />0 <br />3016.00 <br />$10.00 <br />$ 30,160.00 <br />17 <br />2104.503 <br />REMOVE BITUMINOUS CURB <br />LIN FT <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />150 <br />150.00 <br />$4.00 <br />$ 600.00 <br />18 <br />2104.503 <br />REMOVE RETAINING WALL <br />LIN FT <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />90 <br />90.00 <br />$40.00 <br />$ 3,600.00 <br />19 <br />2104.504 <br />REMOVE CONCRETE DRIVEWAY PAVEMENT <br />SO YD <br />185 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />185.00 <br />$10.00 <br />$ 1,850.00 <br />20 <br />2104.504 <br />REMOVE CONCRETE PAVEMENT <br />SO YD <br />15 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />15.00 <br />$12.00 <br />$ 180.00 <br />21 <br />2104.504 <br />REMOVE BITUMINOUS DRIVEWAY PAVEMENT <br />SO YD <br />0 <br />0 <br />0 <br />0 <br />10 <br />0 <br />0 <br />0 <br />0 <br />10.00 <br />$8.00 <br />$ 80.00 <br />22 <br />2104.518 <br />REMOVE BITUMINOUS WALK <br />SO FT <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />16036 <br />16036.00 <br />$1.50 <br />$ 24,064.00 <br />23 <br />2104.602 <br />REMOVE SKIMMER WALL <br />EACH <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 <br />0 <br />0 <br />0 <br />1.00 <br />$1,000.00 <br />$ 1,000.00 <br />24 <br />2105.602 <br />GRADE CHANNEL <br />EACH <br />0 <br />0 <br />0 <br />0 <br />0 <br />5 <br />0 <br />0 <br />0 <br />5.00 <br />$2,000.00 <br />$ 10,000.00 <br />25 <br />2106.507 <br />EXCAVATION - COMMON <br />(EV)(P) <br />CU VD <br />119 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />119.00 <br />$19.00 <br />$ 2,261.00 <br />26 <br />2106.507 <br />MUCK EXCAVATION (POND 1) <br />(EV)(P) <br />CU VD <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />215 <br />215.00 <br />$60.00 <br />$ 12,900.00 <br />27 <br />2106.507 <br />MUCK EXCAVATION (POND 2) <br />(EV)(P) <br />CU VD <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />872 <br />872.00 <br />$60.00 <br />$ 52,320.00 <br />28 <br />2106.507 <br />EXCAVATION-SUBGRADE <br />(EV)(4) <br />CU VD <br />306.07 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />98.93 <br />405.00 <br />$19.00 <br />$ 7,695.00 <br />29 <br />2106.507 <br />SELECT GRANULAR EMBANKMENT <br />(CV)(P) <br />CU VD <br />50 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />50.00 <br />$25.00 <br />$ 1,250.00 <br />30 <br />2106.507 <br />COMMON EMBANKMENT <br />(CV)(P) <br />CU VD <br />53 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />53.00 <br />$10.00 <br />$ 530.00 <br />31 <br />2106.507 <br />STABILIZING AGGREGATE <br />(CV)(4) <br />CU VD <br />405 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />405.00 <br />$35.00 <br />$ 14,175.00 <br />32 <br />2106.601 <br />POND DEWATERING (POND 1) <br />LUMP SUM <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 <br />1.00 <br />$10,000.00 <br />$ 10,000.00 <br />33 <br />2106.601 <br />POND DEWATERING (POND 2) <br />LUMP SUM <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 <br />1.00 <br />$15,000.00 <br />$ 15,000.00 <br />34 <br />2108.504 <br />GEOTEXTILE FABRIC TYPE 7 <br />(P) <br />SO YD <br />2486 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2486.00 <br />$2.70 <br />$ 6,712.20 <br />35 <br />2112.604 <br />SUBGRADE PREPARATION <br />(P)(5) <br />SO YD <br />19714 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />19714.00 <br />$0.90 <br />$ 17,742.60 <br />36 <br />2215.504 <br />FULL DEPTH RECLAMATION <br />(P) <br />SO YD <br />19714 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />19714.00 <br />$3.50 <br />$ 68,999.00 <br />37 <br />2123.610 <br />STREET SWEEPER (WITH PICKUP BROOM) <br />(4) <br />HOUR <br />20 <br />0 <br />0 <br />0 <br />30 <br />0 <br />0 <br />0 <br />0 <br />50.00 <br />$170.00 <br />$ 8,500.00 <br />38 <br />2123.610 <br />EXPLORATORY EXCAVATION <br />HOUR <br />0 <br />12 <br />0 <br />0 <br />0 <br />12 <br />0 <br />0 <br />0 <br />24.00 <br />$800.00 <br />$ 19,200.00 <br />39 <br />2232.504 <br />MILL BITUMINOUS SURFACE (2.0") <br />(P) <br />SO VD <br />0 <br />0 <br />0 <br />0 <br />15834 <br />0 <br />0 <br />0 <br />0 <br />15834.00 <br />$2.00 <br />$ 31,668.00 <br />40 <br />2232.618 <br />MILL AND PATCH BITUMINOUS PAVEMENT <br />(6) <br />SO FT <br />0 <br />0 <br />0 <br />0 <br />7125 <br />0 <br />0 <br />0 <br />0 <br />7125.00 <br />$3.00 <br />$ 21,375.00 <br />41 <br />2357.506 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />GAL <br />1182.91 <br />0 <br />0 <br />0 <br />950.09 <br />0 <br />0 <br />0 <br />0 <br />2133.00 <br />$2.50 <br />$ 5,332.50 <br />42 <br />2360.504 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 3.0" THICK <br />(7) <br />SO VD <br />0 <br />0 <br />0 <br />0 <br />10 <br />0 <br />0 <br />0 <br />0 <br />10.00 <br />$65.00 <br />$ 650.00 <br />43 <br />2360.509 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) <br />TON <br />4636.87 <br />0 <br />0 <br />0 <br />1862.13 <br />0 <br />0 <br />0 <br />0 <br />6499.00 <br />$82.00 <br />$ 532,918.00 <br />44 <br />2411.618 <br />MODULAR BLOCK RETAINING WALL <br />SO FT <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />357 <br />357.00 <br />$55.00 <br />$ 19,635.00 <br />45 <br />2501.502 <br />12" RC PIPE APRON <br />(8) <br />EACH <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 <br />0 <br />0 <br />0 <br />1.00 <br />$950.00 <br />$ 950.00 <br />46 <br />2501.602 <br />TRASH GUARD FOR 54" PIPE APRON <br />(8) <br />EACH <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 <br />0 <br />0 <br />0 <br />1.00 <br />$1,300.00 <br />$ 1,300.00 <br />47 <br />2502.503 <br />4" PERF TP PIPE DRAIN <br />LIN FT <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />110 <br />110.00 <br />$13.00 <br />$ 1,430.00 <br />48 <br />2503.503 <br />15" RC PIPE SEWER CLASS V <br />LIN FT <br />0 <br />118.2 <br />0 <br />0 <br />0 <br />364.8 <br />0 <br />0 <br />0 <br />483.00 <br />$80.00 <br />$ 38,640.00 <br />49 <br />2503.601 <br />STORM SEWER BYPASS <br />LUMP SUM <br />0 <br />0 <br />0 <br />0 <br />0 <br />1 <br />0 <br />0 <br />0 <br />1.00 <br />$10,000.00 <br />$ 10,000.00 <br />50 <br />2503.602 <br />CONNECT TO EXISTING STORM SEWER <br />EACH <br />0 <br />1 <br />0 <br />0 <br />0 <br />19 <br />0 <br />0 <br />0 <br />20.00 <br />$1,500.00 <br />$ 30,000.00 <br />Fn&, fs Est- 711912023 1 d 3 City of Arden Hills, MN <br />