Laserfiche WebLink
1.2. Design Engineering and Design Engineering costs for the Roundabout project <br />have been covered by Agreement PW2022-23R. <br />1.3. Plans for the MVHS Trail Project showing proposed construction will be <br />presented to the County and will be on file at the city of Arden Hills Public <br />Works Department. <br />1.4. Any costs associated with Project revisions after the completion of plans and <br />specifications will be paid for by the party requesting the revisions. Revisions <br />are subject to approval by the County. <br />2. Procurement and Award of Contract <br />3.1 The County will take bids for the Trail and Roundabout projects (to be tied in <br />the same contract) in accordance with state law and County procedures. <br />3.2 The County will prepare an abstract of bids and a cost participation summary <br />based on the lowest responsible bidder's proposal and will provide the same <br />to the City. <br />3.3 The County will request the City's concurrence to award a contract to the <br />lowest responsible bidder. <br />3.4 The County will award a contract and pay the contractor from the County <br />State Aid Highway, Municipal State Aid Highway, and local funds (including <br />Safe Routes to School Grant money) identified for the Projects. <br />3. Responsibility for Construction Engineering <br />3.1. Except for those portions identified in Section 3.1.1 and 3.1.2, the County shall <br />perform or contract the performance of the construction engineering for all <br />elements of the Project. <br />3.1.1. The City will provide construction engineering for city watermain and <br />sanitary sewer for the Roundabout project. <br />3.1.2. The City will provide construction engineering for the MVHS Trail project. <br />4. Project Costs <br />5.1 Except as provided herein, the County and City will participate in the costs of <br />construction in accordance with the Ramsey County Cost Participation Policy <br />and approved in the 2022 — 2026 Ramsey County Transportation <br />Improvement Plan. If there is a conflict between the Cost Participation Policy <br />and this Agreement, this Agreement will prevail. <br />