5.2 A list of the construction pay items and percentages of City funding <br />responsibility as well as the total estimated City Project cost is attached as <br />Attachment B. Cost Participation Based on Engineer's Estimate). Quantities <br />and unit prices in Attachment B are estimates. Actual costs shall be based on <br />the contract unit prices and the quantities constructed. <br />5.3 Mobilization, Field Office, Erosion Control Supervisor, Traffic Control, As Built, <br />Construction Staking, Erosion Control Items (such as Storm Drain Inlet <br />Protection, Water, Street Sweeper) are defined collectively as the "Prorated <br />Items". The City percentage of the Prorated Items is calculated as follows: <br />City % Prorated Items = <br />(City Cost excluding the Prorated Items Cost) <br />(Total Project Cost excluding the Prorated Items Cost) <br />The costs in the Prorated Items calculation will be based on contract unit <br />prices and quantities at the time of contract award. No adjustments in the <br />percentages will be made if unit prices or quantities vary during construction. <br />5.4 Costs for storm sewer construction not eligible for County State Aid Highway <br />funding are the sole responsibility of the City. <br />5.5 Design Engineering Costs for the MVHS Trail Project <br />5.5.1 The County shall pay the City a design engineering fee equal to 18% <br />of the Consultant Design Fees, based on the length of footage of the <br />project on the CSAH 76 (Old Snelling) over the total length of the <br />project times a 50% cost share with the City. <br />County Share = <br />1173.91 feet (on Old Snelling) <br />(1173.91 feet +2185.08 feet) (total) <br />5.5.2 The Design Contract is shown in Attachment E. <br />6. Payment Schedule <br />x 0.5 = 18% <br />5.1 Design engineering for the MVHS Trail project will be invoiced at the time of <br />contract award. <br />5.2 The City shall pay the County a construction engineering fee equal to a <br />percentage of the identified project items as detailed in Attachment B, except <br />as provided below. <br />5.3 The City shall pay the County a construction engineering fee equal to 2% of <br />its share of city watermain and sanitary sewer identified in Attachment B. <br />