My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
01-08-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2024 9:49:46 AM
Creation date
1/12/2024 3:08:32 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
521
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Max. 8 square feet <br />Up to 28 square feet <br />Wall Signage <br />Sign District 5 <br />Flexibility Requested — East <br />Elevation <br />Planning Commission Review <br />The Planning Commission reviewed this application at the December 6, 2023 meeting. A <br />recommended condition of approval was added by the Planning Commission to include "The <br />Applicant must work with City staff to confirm adequate egress." The Commission voted 6-1 to <br />recommend approval with 23 conditions of Planning Case 23-020. <br />Additional Review <br />Building Official <br />The Building Official has reviewed the plans and has no additional comments at this time. A <br />Building Permit will be required prior to any construction taking place. <br />Public Works Director/City Engineer <br />The Public Works Director/City Engineer has reviewed the plans and has provided the Applicant <br />with a comment letter (Attachment N) and all comments shall be adopted herein by reference as a <br />condition of approval. <br />Fire Marshal <br />The Fire Marshal has reviewed the plans. Initial comments were that hydrant locations will need <br />to be reviewed. <br />Ramsey County <br />Ramsey County has reviewed the plans and offers the following comments: <br />• Traffic: Support of single access in updated 2023 car wash layout; queues not expected to <br />extend onto Lexington Av. <br />• Water/Wastewater: SWPPP should show receiving waters, impaired waters, and chain of <br />responsibility. <br />• Programming: Make sure the background geometrics for Lexington Avenue reflect the <br />reconstruction project completed in 2023. See County Construction staff for plans if <br />needed. <br />• Permitting: Sidewalk connection on Lexington Ave. requires a permit from Ramsey <br />County. <br />All Ramsey County comments shall be adopted herein by reference as a condition of approval. <br />Public Comments <br />Notice was published in the Pioneer Press on December 27, 2023. Notice was prepared by the <br />City and mailed to property owners within 1,000 feet of the subject property. The City has not <br />received any public comments regarding this case. <br />Attachments <br />A. Land Use Application <br />B. Location Map <br />C. Narrative <br />D. Civil and Landscape Plans <br />E. Architectural Plans — Exterior <br />Page 17 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.