Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I- <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I- <br />I <br /> <br />,ARDEN HILLS CITY COUNCIL - SEPTEMBER 11. 1995 <br /> <br />7 <br /> <br />Mayor Probst indicated it is the Council's understanding that Mr. Ogren has control of the property. <br /> <br />Mayor Probst indicated the question before the Council is the adequacy of the EA W. <br /> <br />Councilmember Hicks asked about the information provided by Mr. Rem, he inquired as to the <br />significance of 1957 water levels. Mr. Rem indicated this was selected as a typical year. <br /> <br />Councilmember Hicks noted the information denoted the levels increasing by .3 inches each year <br />in the last 40 years, where would the expected changes be for the next 40 years. Mr. Ringwald noted <br />there has been a substantial anaount of development over the last 40 years and until the 1980s there <br />were no regulations regarding run off and drainage, he felt this was one of the major factons for the <br />increase in lake levels. He noted now the area is at its highest level of development <br /> <br />Councilmember Hicks inquired as to the effect of the Valentine Elementary School. Mr. Ringwald <br />noted the impact is not significant since the run off will flow to the west into Valentine Creek and <br />not into Valentine Lake. <br /> <br />Councilmember Hicks inquired why the drainage would be to Valentine Lake and not to Valentine <br />Creek from the proposed development Mr. Ringwald noted the project could provide for a two cell <br />approach with the sediment basin. The ponding would provide water to a historical wetland that is <br />currently not a jurisdictional wetland. Also in providing a connection into Valentine Lake with the <br />piping, through the PUD the City could enforce Shoreland Management requirements. <br /> <br />Mayor Probst asked in regard to the traffic analysis, what impact the traffic would have on the road. <br />Mr. Ringwald indicated in general, the entrance to the development is a safe distance from Old <br />Highway 10 and 490 feet from the entrance to Valentine Hills Elementary, therefore there would be <br />no concern regarding access. In regard to increase in traffic flow, the road was designed as an minor <br />arterial and could support the additional traffic. He noted the additional traffic will not be <br />significant. <br /> <br />Mayor Probst inquired as to the "clear cutting" of a stand of trees. Mr. Ringwald agreed with the <br />definition given by Ms. Holmes for a stand of trees, but indicated in his assessment the cluster of <br />trees he was referring to will still be within the development. The area to be cleared would be <br />mostly brush and not defined as a stand of trees. <br /> <br />Mayor Probst asked if a survey of the vegetation was available. Mr. Ringwald noted there is one, <br />but he did not have it available at the Meeting. <br /> <br />Mayor Probst inquired if there is a body of evidence to support an archaeological survey. Mr. <br />Ringwald indicated he did not feel the Minnesota Historical Society provided enough information <br />to warrant a survey, and also noted there are mechanisms available should any remains be found <br />during construction. He noted it is a felony to continue work if any remains are found. <br />