Pay Request No.: 52022 SNELLING AVENUE NORTH STREET & UTILITY IMPROVEMENTSCITY OF ARDEN HILLSBMI PROJECT NO. 0T1.124965WORK COMPLETED THROUGH FRIDAY, AUGUST 04, 2023ITEM UNITESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATEDNO.ITEMPRICEQUANTITYAMOUNTQUANTITYAMOUNTQUANTITYAMOUNT1 MOBILIZATION$65,000.00 1.00 LUMP SUM $65,000.00 1.00 LUMP SUM $65,000.00 1.00 LUMP SUM $65,000.002 CLEARING$1,050.00 2.00 EACH $2,100.00 4.00 EACH $4,200.00 4.00 EACH$4,200.003 GRUBBING$210.00 2.00 EACH $420.00 1.00 EACH $210.00 1.00 EACH $210.004 PAVEMENT MARKING REMOVAL$1.31 811.00 LIN FT $1,062.41 1,021.00 LIN FT $1,337.51 1,021.00 LIN FT $1,337.515 REMOVE GATE VALVE & BOX$525.00 9.00 EACH $4,725.00 9.00 EACH $4,725.00 9.00 EACH $4,725.006 REMOVE HYDRANT$787.50 2.00 EACH $1,575.00 2.00 EACH $1,575.00 2.00 EACH $1,575.007 REMOVE DRAINAGE STRUCTURE$840.00 1.00 EACH $840.00 1.00 EACH $840.00 1.00 EACH $840.008 SALVAGE SIGN$42.00 5.00 EACH $210.00 5.00 EACH $210.00 7.00 EACH $294.009 SALVAGE MAILBOX SUPPORT$52.50 12.00 EACH $630.00 16.00 EACH $840.00 16.00 EACH $840.0010 SAWING CONCRETE PAVEMENT (FULL DEPTH) $8.00 31.00 LIN FT $248.00 31.00 LIN FT $248.00 31.00 LIN FT $248.0011 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) $5.00 722.00 LIN FT $3,610.00 597.00 LIN FT $2,985.00 597.00 LIN FT $2,985.0012 REMOVE WATERMAIN$21.00 229.00 LIN FT $4,809.00 127.00 LIN FT $2,667.00 127.00 LIN FT $2,667.0013 REMOVE SEWER PIPE (STORM)$21.00 25.00 LIN FT $525.00 25.00 LIN FT $525.00 25.00 LIN FT $525.0014 REMOVE CURB & GUTTER$6.50 445.00 LIN FT $2,892.50 440.00 LIN FT $2,860.00 440.00 LIN FT $2,860.0015 REMOVE CONCRETE DRIVEWAY PAVEMENT $12.00 50.00 SQ YD$600.00 45.00 SQ YD $540.00 45.00 SQ YD $540.0016 REMOVE BITUMINOUS DRIVEWAY PAVEMENT $8.00 515.00 SQ YD $4,120.00 427.80 SQ YD $3,422.40 427.80 SQ YD $3,422.4017 REMOVE BITUMINOUS PAVEMENT$3.50 349.00 SQ YD $1,221.50 310.10 SQ YD $1,085.35 310.10SQ YD $1,085.3518 ABANDON WATERMAIN$26.62 79.00 LIN FT $2,102.98 75.00 LIN FT $1,996.50 75.00LIN FT $1,996.5019 SALVAGE BRICK PAVERS$5.00 765.00 SQ FT $3,825.00 795.00 SQ FT $3,975.00 795.00SQ FT $3,975.0020 EXCAVATION - COMMON$28.00 168.00 CU YD $4,704.00 168.00 CU YD $4,704.00 168.00 CU YD $4,704.0021 EXCAVATION - SUBGRADE$28.00 522.00 CU YD $14,616.00 46.80 CU YD $1,310.40 46.80CU YD $1,310.4022 SELECT GRANULAR EMBANKMENT$18.00 627.00 CU YD $11,286.00 122.00 CU YD $2,196.00 122.00 CU YD $2,196.0023 COMMON EMBANKMENT$28.00 180.00 CU YD $5,040.00 180.00 CU YD $5,040.00 180.00 CU YD $5,040.0024 STABILIZING AGGREGATE$38.00 522.00 CU YD $19,836.00 39.80 CU YD $1,512.40 39.80CU YD $1,512.4025 HAUL & DISPOSE OF CONTAMINATED SOIL $55.00 487.00 CU YD $26,785.00 0.00 CU YD $0.00 0.00 CU YD $0.0026 SUBGRADE PREPARATION$295.00 46.00 RDST $13,570.00 46.00 RDST $13,570.00 46.00 RDST $13,570.0027 AGGREGATE SURFACING, CLASS 2$45.00 18.00 CU YD $810.00 17.35 CU YD $780.75 17.35 CU YD $780.7528 AGGREGATE BASE CLASS 5$28.00 157.00 CU YD $4,396.00 82.00 CU YD $2,296.00 82.00 CU YD $2,296.0029 FULL DEPTH RECLAMATION$3.50 20,568.00 SQ YD $71,988.00 20,568.00 SQ YD $71,988.00 20,568.00 SQ YD $71,988.0030 BITUMINOUS MATERIAL FOR TACK COAT$0.01 681.00 GAL $6.81 800.00 GAL $8.00 800.00 GAL $8.0031 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 3.0" THICK $28.00 427.00 SQ YD $11,956.00 428.00 SQ YD $11,984.00428.00 SQ YD $11,984.0032 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) $76.50 3,530.00 TON $270,045.00 3,343.40 TON $255,770.25 3,343.40 TON $255,770.2533 15" RC PIPE APRON$1,722.11 10.00 EACH $17,221.10 9.00 EACH $15,498.99 9.00 EACH $15,498.9934 6" PERF PVC PIPE DRAIN$71.16 150.00 LIN FT $10,674.00 150.00 LIN FT $10,674.00 150.00 LIN FT $10,674.0035 6" PVC PIPE DRAIN CLEANOUT$458.90 1.00 EACH $458.90 1.00 EACH $458.90 1.00 EACH $458.9036 15" RC PIPE SEWER CLASS V$90.95 225.00 LIN FT $20,463.75 223.50 LIN FT $20,327.33 223.50 LIN FT $20,327.3337 LINING SEWER PIPE 10"$106.79 140.00 LIN FT $14,950.60 70.00 LIN FT $7,475.30 102.55 LIN FT $10,951.3138 PRE-LINING HEAVY CLEANING$16.28 140.00 LIN FT $2,279.20 0.00 LIN FT $0.00 140.00 LIN FT $2,279.2039 TEMPORARY WATER SERVICE$11,550.00 1.00 LUMP SUM $11,550.00 1.00 LUMP SUM $11,550.00 1.00 LUMP SUM $11,550.0040 CONNECT TO EXISTING WATERMAIN$1,813.98 6.00 EACH $10,883.88 6.00 EACH $10,883.88 6.00 EACH $10,883.8841 HYDRANT$5,806.55 1.00 EACH $5,806.55 1.00 EACH $5,806.55 1.00 EACH$5,806.5542 ADJUST GATE VALVE & BOX$325.00 5.00 EACH $1,625.00 5.00 EACH $1,625.00 5.00 EACH $1,625.0043 6" GATE VALVE & BOX$2,238.44 1.00 EACH $2,238.44 1.00 EACH $2,238.44 1.00 EACH$2,238.4444 8" GATE VALVE & BOX$2,897.63 8.00 EACH $23,181.04 8.00 EACH $23,181.04 8.00 EACH $23,181.0445 BURSTING PITS - TRENCHLESS WATERMAIN $3,451.88 1.00EACH $3,451.88 1.00 EACH $3,451.88 1.00 EACH $3,451.8846 CONNECTION PITS - TRENCHLESS WATERMAIN $3,451.88 4.00 EACH $13,807.52 3.00 EACH $10,355.64 3.00 EACH $10,355.6447 6" WATERMAIN DUCTILE IRON CL 52$109.03 16.00 LIN FT $1,744.48 22.90 LIN FT $2,496.79 22.90 LIN FT $2,496.7948 8" WATERMAIN DUCTILE IRON CL 52$121.89 159.00 LIN FT $19,380.51 202.50 LIN FT $24,682.73202.50 LIN FT $24,682.7349 PIPE BURST 8" WATERMAIN$103.51 551.00 LIN FT $57,034.01 500.00 LIN FT $51,755.00500.00 LIN FT $51,755.0050 DUCTILE IRON FITTINGS$17.69 761.00 LB $13,462.09 982.00 LB $17,371.58 982.00 LB $17,371.58ESTIMATEDAS BID PREVIOUS ESTIMATE COMPLETED TO DATEH:\ARDH\0T1124965\7_Construction\E_Quantities\0T1.124965 Pay Application No 5.xlsmPage 2 of 310/12/20234:09 PM