Laserfiche WebLink
Pay Request No.: 52022 SNELLING AVENUE NORTH STREET & UTILITY IMPROVEMENTSCITY OF ARDEN HILLSBMI PROJECT NO. 0T1.124965WORK COMPLETED THROUGH FRIDAY, AUGUST 04, 2023ITEM UNITESTIMATEDESTIMATEDESTIMATEDESTIMATEDESTIMATEDNO.ITEMPRICEQUANTITYAMOUNTQUANTITYAMOUNTQUANTITYAMOUNTESTIMATEDAS BID PREVIOUS ESTIMATE COMPLETED TO DATE51 CASTING ASSEMBLY$1,100.00 13.00 EACH $14,300.00 14.00 EACH $15,400.00 14.00 EACH $15,400.0052 ADJUST FRAME & RING CASTING$795.00 2.00 EACH $1,590.00 4.00 EACH $3,180.00 4.00 EACH $3,180.0053 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (2'X3' CB) $679.94 43.90 LIN FT $29,849.37 43.90 LIN FT $29,849.37 43.90 LIN FT $29,849.3754 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4022 $581.34 7.00 LIN FT $4,069.38 7.90 LIN FT $4,592.59 7.90 LIN FT $4,592.5955 INFILTRATION/FILTRATION SYSTEM RESTORATION $45.00 151.00 SQ YD $6,795.00 151.00 SQ YD $6,795.00 151.00 SQ YD $6,795.0056 RANDOM RIPRAP CLASS III$157.50 55.00 CU YD $8,662.50 66.50 CU YD $10,473.75 66.50CU YD $10,473.7557 6" CONCRETE WALK$13.13 1,521.00 SQ FT $19,970.73 1,261.00 SQ FT $16,556.93 1,261.00 SQ FT $16,556.9358 3" BITUMINOUS WALK$2.50 38,242.00 SQ FT $95,605.00 38,075.00 SQ FT $95,187.50 38,075.00 SQ FT $95,187.5059 CONCRETE CURB & GUTTER DESIGN B618 $15.23 7,775.00 LIN FT $118,413.25 7,587.00 LIN FT $115,550.01 7,587.00 LIN FT $115,550.0160 CONCRETE CURB & GUTTER DESIGN S518 (MOD) $31.50 32.00 LIN FT $1,008.00 32.00 LIN FT $1,008.00 32.00 LIN FT $1,008.0061 6" CONCRETE DRIVEWAY PAVEMENT$56.70 89.00 SQ YD $5,046.30 40.60 SQ YD $2,302.02 40.60 SQ YD $2,302.0262 7" CONCRETE VALLEY GUTTER$85.05 28.00 SQ YD $2,381.40 28.00 SQ YD $2,381.40 28.00 SQ YD $2,381.4063 TRUNCATED DOMES$52.50 204.00 SQ FT $10,710.00 256.00 SQ FT $13,440.00 256.00 SQ FT $13,440.0064 RELOCATE MISCELLANEOUS STRUCTURES $1,000.00 2.00 EACH $2,000.00 0.00 EACH $0.00 0.00 EACH $0.0065 INSTALL MAILBOX SUPPORT$157.50 12.00 EACH $1,890.00 16.00 EACH $2,520.00 16.00 EACH $2,520.0066 INSTALL BRICK PAVERS$22.00 572.00 SQ FT $12,584.00 690.00 SQ FT $15,180.00 690.00 SQ FT $15,180.0067 TRAFFIC CONTROL$28,000.00 1.00 LUMP SUM $28,000.00 1.00 LUMP SUM $28,000.00 1.00 LUMP SUM $28,000.0068 DYNAMIC SPEED DISPLAY SIGN$13,600.00 1.00 EACH $13,600.00 1.00 EACH $13,600.00 1.00 EACH $13,600.0069 INSTALL SIGN$262.50 5.00 EACH $1,312.50 5.00 EACH $1,312.50 7.00 EACH $1,837.5070 SIGN PANELS TYPE C$54.60 104.00 SQ FT $5,678.40 104.00 SQ FT $5,678.40 104.00 SQ FT $5,678.4071 STABILIZED CONSTRUCTION EXIT$1,500.00 1.00 LUMP SUM $1,500.00 0.00 LUMP SUM $0.00 0.00LUMP SUM $0.0072 STORM DRAIN INLET PROTECTION$125.00 18.00 EACH $2,250.00 17.00 EACH $2,125.00 17.00 EACH $2,125.0073 SEDIMENT CONTROL LOG TYPE WOOD FIBER $3.25 10,232.00 LIN FT $33,254.00 9,860.00 LIN FT $32,045.00 9,860.00 LIN FT $32,045.0074 COMMON TOPSOIL BORROW$37.00 863.00 CU YD $31,931.00 1,112.00 CU YD $41,144.00 1,112.00 CU YD $41,144.0075 ROLLED EROSION PREVENTION CATEGORY 25 W/ SEED $3.25 9,077.00 SQ YD $29,500.25 9,540.00 SQ YD $31,005.00 9,540.00 SQ YD $31,005.0076 4" SOLID LINE MULTI-COMPONENT$0.58 428.00 LIN FT $248.24 1,889.00 LIN FT $1,095.62 1,889.00 LIN FT $1,095.6277 24" SOLID LINE MULTI-COMPONENT$5.88 283.00 LIN FT $1,664.04 227.00 LIN FT $1,334.76 227.00 LIN FT $1,334.7678 4" DOUBLE SOLID LINE MULTI-COMPONENT $1.16 4,103.00LIN FT $4,759.48 4,149.00 LIN FT $4,812.84 4,149.00 LIN FT $4,812.8479 PAVEMENT MESSAGE MULTI-COMPONENT $7.35 30.00 SQ FT $220.50 32.00 SQ FT $235.20 32.00 SQ FT $235.2080 CROSSWALK MULTI-COMPONENT$4.20 720.00 SQ FT $3,024.00 720.00 SQ FT $3,024.00 720.00SQ FT $3,024.000 0FINALTOTAL AMOUNT:$1,277,585.49 $1,190,063.50 $1,196,427.71H:\ARDH\0T1124965\7_Construction\E_Quantities\0T1.124965 Pay Application No 5.xlsmPage 3 of 310/12/20234:09 PM