Laserfiche WebLink
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2024 2028 <br />thru Department Street Department <br /> Description <br />Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous <br />pavement, repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs. Street segments include: <br />Benton Way loop south of Harriet, Tiller Lane (Lexington to Cannon Ave), Cannon Ave (Tiller Ln to Dunlap), Dunlap (Cannon Ave to Tiller <br />Lane), Ingerson Rd, Ingerson Ct, Hamline Ave N (Hamline Ave N to Ingerson Rd), Pine Tree Dr, Harriet Ave, Walden Pl, Lametti Ln, Lametti Ct, <br />Bussard Ct, Hunters Ct, Fernwood St, Fernwood Ct, Dellwood Ave and Carlton Dr. Dredging Fernwood sediment pond and adding grit chambers, <br />pipe lining dual storm crossing Hamline Ave N and 2-400 ft sanitary sewer 10-inch forcemain rehab. <br />Project #28-Str-001 <br />Priority 2 Very Important <br /> Justification <br />Pavement conditions are showing distress with condition ratings from 15 to 59. Pavement conditions will continue to decline. Proposed <br />improvements are necessary to continue safe and reliable street and utility services. These improvements will address the increasing costs for <br />patching and maintaining highly deteriorated street pavement within the City. <br /> Budget Impact/Other <br />Useful Life 20-25 <br />Project Name 2028 PMP Category Streets: Reconstruction <br />Type Improvement <br />TCAAP No <br />Total Project Cost:$3,765,000 <br />Total2024 2025 2026 2027 2028Expenditures <br />3,765,0003,765,000Construction/Maintenance <br />3,765,000 3,765,000Total <br />Total2024 2025 2026 2027 2028Funding Sources <br />775,000775,000Capital Improvement Funds <br />(PIR) <br />1,200,0001,200,000Other <br />340,000340,000Sanitary Sewer Utility Fund <br />350,000350,000State Aid <br />950,000950,000Surface Water Mgmt Utility <br />Funds <br />150,000150,000Water Utility Funds <br />3,765,000 3,765,000Total <br />Produced Using the Plan-It Capital Planning Software <br />53