My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-11-23-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2023
>
12-11-23-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2024 1:34:29 PM
Creation date
1/23/2024 1:31:53 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
354
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Arden Hills, Minnesota Contact Public Works Director <br />2024 2028 <br />thru Department Water Department <br /> Description <br />2024 - South Water Tower maintenance. <br />Clean, inspect and repair tank interior of this 1 million gallon storage facility in accordance with MN Department of Health guidelines. <br />2026 - North Water Tower order inspection report. <br />2027 - North Water Tower maintenance. <br />Clean, inspect and repair tank interior of this 500,000 gallon storage facility in accordance with MN Department of Health guidelines. <br />2030 - South Water Tower order inspection report. <br />2031 - South Water Tower maintenance. <br />Clean, inspect and repair tank interior of this 1 million gallon storage facility in accordance with MN Department of Health guidelines. <br />2033 - North Water Tower order inspection report. <br />2034 - North Water Tower maintenance. <br />Clean, inspect and repair tank interior of this 500,000 gallon storage facility in accordance with MN Department of Health guidelines. <br />Listed costs are estimates only. Inspections will determine the extent of minor repairs required. <br />Project #24-W-001 <br />Priority 2 Very Important <br /> Justification <br />The MN Department of Health recommends that storage facilities for public water supply systems are inspected and maintained on a 5-year cycle. <br />Last rehab on South Tower was completed in 2013 ($816,256). Next one due in 2038. <br />Last rehab on North Tower was completed in 2018 ($608,125). Next one due in 2043. <br /> Budget Impact/Other <br />Useful Life 10 <br />Project Name Water Tower Maintenance Category Utility Maintenance <br />Type Unassigned <br />TCAAP No <br />Total Project Cost:$830,000 <br />Total2024 2025 2026 2027 2028Expenditures <br />510,000350,000 10,000 150,000Construction/Maintenance <br />350,000 10,000 150,000 510,000Total <br />Total2024 2025 2026 2027 2028Funding Sources <br />510,000350,000 10,000 150,000Water Utility Funds <br />350,000 10,000 150,000 510,000Total <br />Produced Using the Plan-It Capital Planning Software <br />54
The URL can be used to link to this page
Your browser does not support the video tag.