Laserfiche WebLink
<br />. <br />. <br />.. <br />. <br />. <br />. <br />. <br />. <br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />. <br /> <br />Arden Hills Council <br /> <br />5 <br /> <br />March 14, 1994 <br /> <br />Engineer Maurer stated the road would be able to <br />withstand normal traffic which would include garbage <br />trucks and school buses. If any future development would <br />take place in this area, another access would have to be <br />gained to this area. The project as proposed would not <br />be designed for heavy equipment. <br /> <br />Steve zilmer. Carol Perkins. 3363 North Dun]ap - He asked <br />what assessment amount was anticipated for his property? <br /> <br />Winkel stated he would review his parcel and get back to <br />him at a later date. <br /> <br />Kurt Lawrence. 4516 Keithson Drive - He referred to the <br />liability issue of a poorly developed road and who is <br />responsible. He asked what was the anticipated life <br />expectancy of a new street? <br /> <br />Maurer noted that it was a drought year when this road <br />was originally constructed. As moisture began to build <br />up as experienced in the past couple of years, the soil <br />began to consolidate causing recompaction of soil. He <br />further noted that due to the number of settlements on <br />this road, it cannot be leveled properly without the <br />recycling, and it would be physically impossible to <br />patch. <br /> <br />Jim Cox. 1287 Ingerson Road - Mr. Cox asked what quality <br />control measures would be taken to ensure the safety of <br />children. He noted that since construction would be <br />taking place during the summer months, children would be <br />playing around the heavy construction equipment. He <br />suggested that the project specifications include <br />stringent safety measures. <br /> <br />Maurer explained that his engineering firm would oversee <br />the project and that all parties abide by the acceptable <br />standards set by MNDOT to ensure safety. He further <br />explained that a contractor is allowed to phase in the <br />project in an economical manner, therefore there are <br />stages to the construction process. <br /> <br />Ron Nelson. 4504 Keithson Drive - He echoed the concerns <br />brought up by Mr. Lawrence. He too expressed the issue <br />of defective workmanship demonstrated by the former <br />contractor, and did not feel the total problem was due to <br />the drought year. <br /> <br />Engineer Maurer stated he did not mean to infer that the <br />drought was the reason for the defects in the road. He <br />only suggested this as one possible reason for the <br />deterioration. <br />