My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-23-1987
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1980-1989
>
1987
>
CCP 02-23-1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:07:52 PM
Creation date
11/3/2006 2:41:39 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> , <br /> PROJECTS P-86-28, GLENHILL ROAD; P-86-29, ASBURY STREET; P-86-31, SHELDON <br /> . STREET; P-86-32, PASCAL STREET; P-86-33, ARONA STREET WITH CENTENNIAL DRIVE <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> CONCLUSIONS: <br /> 1. All five of these projects including the necessary appurtenances are <br /> feasible as proposed. <br /> 2. The total cost for each of these projects is as follows: <br /> P-86-28, Glenhill Road $ 83,000 <br /> P-86-29, Asbury Street 159,400 <br /> P-86-31, Sheldon Street 51,400 <br /> P-86-32, Pascal Street 112,400 <br /> P-86-33, Arona Street/Centennial Drive 80,900 <br /> 3. Any repairs found to be needed in the sanitary sewer, watermain, or <br /> . storm drainage system should be undertaken at the time the roadways <br /> are excavated. <br /> 4. All of these projects lie within two of the ten designated areas to be <br /> done as part of the Pavement Management Program during 1987. They are <br /> rated as "problem" roadways. <br /> RECOM}ffiNDATIONS: <br /> 1- The projects be constructed as proposed in this report. <br /> 2. The projects be constructed in 1987 and combined with other city <br /> roadway projects for construction purposes. <br /> 3. The projects be consolidated with the other residential reconstruction <br /> projects into a single, city-wide project for assessment purposes. <br /> 4. The sanitary sewer and watermain facilities be investigated further <br /> and repairs made if they are found to be deficient. <br /> 5. A public hearing be established for these improvements on February 3, <br /> 1987. <br /> . <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.