Laserfiche WebLink
<br /> - ARDEN HILLS PARKS DEPARTMENT <br /> PEDESTRIAN TRAILS <br /> - Proposed Blacktopping Schedule <br /> The trails were divided into four categories; (1) section recommended for <br /> blacktopping in 1987 because of high usage and difficult terrain, (2) (3) <br /> and (4) suggested priority for blacktopping in the future as/if funds are <br /> available. <br /> Length Surface <br /> Arden Trail <br /> Glenpaul to Stowe 2,575 ft. Ag Lime 2 <br /> Stowe to Cty. Rd. E 1,500 Grass 2 <br /> Chatham Trails <br /> Connection 1,200 160 ft. 4 <br /> hard surface <br /> 1,040 ft. <br /> grass, blocks <br /> Corridors 4 <br /> (600 ft. leading to Valentine School) 1 <br /> Town House Trails <br /> Village Hall Trail 2,300 Grass 3 <br /> NSP Trail 1,300 Grass 3 <br /> . Corridor 740 Grass 4 <br /> Floral to Norma Corridor 600 Ag Lime 1 <br /> Cummin~s Park to Floral Trail - <br /> Cummings Park Trail 1,500 Grass 3 <br /> Cummings to Floral 2,050 Grass 2 <br /> Floral 2,000 Grass 3 <br /> Crepeau Nature Preserve <br /> Nature trails 2,800 Grass 4 <br /> Breakdown by Runnin~ Foot <br /> Phase 1 - 620 ft. <br /> Phase 2 - 6,125 ft. <br /> Phase 3 - 15,540 ft. <br /> Phase 4 - 4,580 ft. <br /> . <br />