My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
02-12-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 4:25:01 PM
Creation date
2/8/2024 4:11:02 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Full -Depth Reclamation consists of grinding the existing pavement, shaping the generated aggregate <br />material to raise the center crown to improve pavement drainage and repaving the roadway with 4-inches of <br />bituminous pavement. <br />Streets proposed for Mill & Overlay: <br />• Briarknoll Circle <br />• Briarknoll Drive from Snelling Avenue North to Norma Avenue <br />• Royal Lane from Norma Avenue to Floral Drive West <br />• McClung Drive from Snelling Avenue North to Colleen Avenue <br />• Colleen Circle <br />• Arden Vista Court <br />Mill & Overlay consists of grinding and removing the top 2-inches of existing pavement and repaving the <br />roadway with 2-inches of bituminous pavement. <br />The project plans and specifications are prepared and the project is ready for solicitation of <br />construction bids. Adoption of Resolution 2024-008 will approve the plans and specification and order <br />advertisement for bids for the 2024 PMP Street & Utility Improvements project. Bids would be <br />received on March 6, 2024 and presented to the City Council on March 11, 2024 with an appropriate <br />resolution to proceed to an assessment hearing for the project before awarding the construction contact. <br />This schedule will allow for contract award on April 8, 2024 with construction starting this summer. <br />Staff recommends adoption of Resolution 2024-008 as provided in Attachment A. <br />The final plan set and specifications consists of 85 pages. Full copies of these documents are on file <br />and available upon request to the City Clerk or by downloading from the project webpage prior to the <br />start of bidding. Selected plan sheets illustrating the project improvements are provided in Attachment <br />B. <br />Budget Impact <br />The estimated total project cost and funding sources based on the final plans and specifications are <br />summarized below. <br />Total Estimated Expenses <br />Construction: $ 2,176,340 <br />Engineering Design: $ 213,457 <br />Construction Mgmt: $ 128,299 <br />Materials Testing: $ 28,222 <br />Construction Contingency: $ 217,634 <br />TOTAL ESTIMATE: $ 2,763,952 <br />Proposed project funding sources are a combination of the City's Permanent Improvement Revolving <br />(PIR) fund, utility funds, and special assessments for street improvements summarized in the following <br />table: <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.