My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
02-12-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 4:25:01 PM
Creation date
2/8/2024 4:11:02 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ramsey County Department of Public Works <br />1425 Paul Kirkwold Drive <br />Arden Hills, MN 55112 <br />Contractor: <br />Bituminous Roadways, Inc. <br />Project Location: <br />County Rd. E and Old Snelling Ave. <br />The Contract is amended as follows: <br />CHANGE ORDER 10 <br />Contractor's Address: <br />1520 Commerce Dr. <br />Mendota Heights, MN 55120 <br />Project Description: <br />Road Reconstruction <br />SUPPLEMENTAL TO <br />CONTRACT CCO03151 <br />Attachment D <br />State Aid Project No. <br />S.A.P.062-676-006 <br />Account No. <br />P - 3420 <br />1. Division S-24.1 "Determination and Extension of Contract Time" states that the "Contractor must complete all Work to <br />meet the requirements of 1516.2 (Project Acceptance) under this Contractor before November 1, 2023. Due to the high <br />volume of existing private utilities requiring to be relocated, the Contractor was unable to schedule and complete contract <br />work by this date. For this reason, the Engineer hereby revises the S-24.1 Project Acceptance date to June 1, 2024. <br />2. Division S-24.5 "Determination and Extension of Contract Time" states that the Old Snelling and County Road E <br />roundabout shall be open to traffic by August 28t'', 2023, to accommodate ISD #621 and Bethel University traffic. The <br />Engineer directed the Contractor to remove closures and detours and open the roundabout to traffic on August 28', 2023 as <br />required by the Contract, and manage traffic utilizing flagging operations conforming to the MUTCD. As allowed per <br />Contract S- 73 "Additional Traffic Control Devices", the Engineer agreed to reimburse the cost for the requested flagging <br />operations for work at the intersection after the opening date of August 28tt', 2023. <br />3. The Mounds View High School Trail Improvements project (SAP 187-108-001) included S-75 "Detour Signing" provision <br />and pay item allowing the contractor the ability to close Lake Valentine and propose a traffic detour. The contractor was <br />unable to start work along Lake Valentine until later in the summer due to delays in private utility relocation schedules. By <br />the time the contractor was able to begin operations, back -to -school activities were beginning to resume, increasing traffic <br />along Lake Valentine. The Engineer determined that a flagging operation would provide means of continual traffic in both <br />directions while work was performed on the trail project. The City preferred a flagging traffic control operation alternative <br />to any road closures both for the safety of students returning to school, and convenience of bus and residential traffic along <br />an increasingly busy road. As allowed per Contract S- 73 "Additional Traffic Control Devices", the Engineer agreed to <br />reimburse the cost for the requested flagging operations for work at the intersection after the opening date of August 28th, <br />2023. <br />The Engineer and Contractor agreed upon the negotiated unit prices for the extra as shown below in the Estimate of Costs. <br />The Contractor shall not make any claim of any kind or character whatsoever for any other costs or expenses which he may have <br />incurred of which he may hereafter incur in performing the work and furnishing the materials required by this agreement. <br />Item No. Item <br />2563.610 Flagger(County) <br />2563.610 Flagger(City) <br />S.A.P. 062-676-006 (Ramsey County) <br />S.A.P 187-108-004 (City of Arden Hills) <br />2 6 2024 �� O�1 <br />Date Approved By <br />County Project Engineer <br />Date Approved By <br />County Engineer <br />ESTIMATE OF COSTS <br />Unit Unit Price Quanti1y Amount <br />Dollar $1.00 45,634 $45,634.00 <br />Dollar $1.00 25,195 $25,195.00 <br />Net Total Change: $70,829.00 <br />yea er Paul Nunes*no <br />2-6-24 PAUL HILDEST L"H08 ---'gin -o --, <br />Date Approved By <br />Contractor <br />Date Accepted By <br />Assist. D.E. State Aid Metro <br />
The URL can be used to link to this page
Your browser does not support the video tag.