Laserfiche WebLink
PROJECT COSTS <br />Construction contract <br />233,650.00 <br />Construction overage <br />8,633.46 <br />Engineering <br />59,492.07 <br />Materials testing <br />2,883.00 <br />Camera, bids, misc <br />1,796.98 <br />TOTAL 306,455.51 <br />FUNDING SOURCES <br />Equipment & Building Fund 306,455.51 <br />Attachments <br />Attachment A: Pay Request No. 4 with Final Closeout does <br />Page 2 of 2 <br />