My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-12-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
02-12-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2024 4:25:01 PM
Creation date
2/8/2024 4:11:02 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT ITEM — 8L <br />,-i DEN HILLS <br />MEMORANDUM <br />DATE: February 12, 2024 <br />TO: Honorable Mayor and City Councilmembers <br />David Perrault, City Administrator <br />FROM: David Swearingen, P.E. Public Works Director / City Engineer <br />SUBJECT: Resolution Approving Plans & Specifications and Order Advertisement for Bids <br />for the 2024 CIPP Lining Project <br />Budgeted Amount: Actual Amount: Funding Source: <br />$415,000 $487,396 Sanitary Sewer Fund, MCES I/I <br />(Estimate w/ Alternate) <br />Council Should Consider <br />Motions to approve, table, or deny the following: <br />Adopting Resolution 2024-010 Approving Plans and Specifications and Ordering <br />Advertisement for Bids for the 2024 CIPP Lining Project. <br />Background/Discussion <br />The 2024 — 2028 Capital Improvement Program identifies improvements of the 2024 Cured In - <br />Place Pipe (CIPP) Lining project scheduled for construction in the year 2024. The City Council <br />approved professional services with engineering consultant, TKDA, to prepare construction <br />plans and specifications on September 25, 2023. <br />The proposed project includes inflow and infiltration repairs to the existing sanitary sewer within <br />the Arden View Drive neighborhood. Through the Public Works' sanitary sewer maintenance <br />program, inspections identified the proposed segments of sewer needing repairs due to <br />significant cracks or voids, root intrusion and also aging clay pipe (VCP) that indicated a need <br />for rehabilitation. Through the CIPP process, I & I is eliminated at the joints and cracks of the <br />existing pipe and the new lining is known to extend the life of the pipe by at least 50 years. <br />Adoption of Resolution 2024-010 will approve the plans and specification and order bid <br />advertisement for the 2024 CIPP Lining project. Bids would be received on March 6, 2024, and <br />presented to the City Council on March 11, 2024, with an appropriate resolution to award the <br />construction contract. This schedule will allow for construction to begin this summer and a final <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.