Laserfiche WebLink
DocuSign Envelope ID: 84121D55-A129-464C-A8C6-8702BE957EC5 <br />Kim ey>>> Horn Page 2 <br />Task 2.1: Define the development scenarios <br />Kimley-Horn will coordinate with the City to understand any planned development changes which are <br />different from the scenarios studied in the 2014 AUAR and 2019 AUAR Update. We have assumed <br />that the scenarios will remain the same. <br />Task 2.2: Determine and document what has been completed within the study area <br />Kimley-Horn will coordinate with the City to understand and quantify what has been completed since <br />2019 and which mitigation measures identified in the mitigation plan have been implemented. Based <br />on this, Kimley-Horn will prepare a list of completed development and mitigation for the AUAR <br />Update. <br />Task 2.3: Review/update impact assessment <br />The information presented in the 2014 AUAR and 2019 AUAR Update will be updated as described <br />below. <br />The following are areas of no anticipated change. These will be listed in the AUAR Update and no <br />updated analysis will be completed. <br />Geology, soils, and topography/landforms <br />Historic properties <br />• Air <br />• Noise <br />• Cumulative potential effects <br />• Other potential environmental effects <br />Updates will be completed for the following areas: <br />• Cover types <br />■ Kimley-Horn will create an updated existing cover types exhibit. <br />• Land use <br />■ Kimley-Horn will update the future land use discussion to reflect the adopted 2040 <br />Comprehensive Plan and the building heights allowed under the current city code. <br />• Water resources <br />■ Kimley-Horn will update the surface water discussion to reflect current regulatory status. <br />• Contamination/hazardous materials/solid wastes <br />■ Kimley-Horn will update the description of environmental covenants on site. The site <br />being removed from the Superfund list will also be described. <br />