Laserfiche WebLink
DocuSign Envelope ID: 84121D55-A129-464C-A8C6-8702BE957EC5 <br />Kim ey>>> Horn Page 5 <br />non -site generated traffic volumes for the weekday AM and PM peak periods for the horizon <br />year for the two proposed scenarios. <br />• Intersection Capacity Analysis: Intersection capacity analysis for the weekday AM and PM <br />peak periods will be performed at the study intersections. The analysis scenarios are: <br />■ Existing Conditions <br />■ Horizon Year background conditions <br />■ Horizon Year Scenario 1 build conditions <br />■ Horizon Year Scenario 2 build conditions <br />• Mitigation: Kimley-Horn will review the current AUAR mitigation plan and if the results of the <br />analysis indicate that changes to the plan are needed, Kimley-Horn will identify the types of <br />improvements required to support the proposed development. <br />• Document Study Results and Project Coordination: An electronic (.pdf) draft report that <br />documents the study methodology, traffic volumes, analysis results, and mitigation <br />recommendations will be prepared and submitted for review and comment. Kimley-Horn will <br />then incorporate internal review comments and submit an electronic copy of the traffic study <br />report and analysis output to the local agencies for review. Kimley-Horn will attend up to two <br />(2) meetings with the review agencies to discuss the results and recommendations of the <br />traffic study. <br />SERVICES NOT INCLUDED <br />Any other services, including but not limited to the following, are not included in this Agreement: <br />• Analysis of new or modified development scenarios <br />• <br />• Activities in response to any formal agency objections to the AUAR Update <br />ADDITIONAL SERVICES <br />Any services not specifically provided for in the above scope will be billed as additional services and <br />performed at our then current hourly rates. <br />INFORMATION PROVIDED BY CLIENT <br />We shall be entitled to rely on the completeness and accuracy of all information provided by the <br />Client or the Client's consultants or representatives. The Client shall provide all information requested <br />by Kimley-Horn during the project, including but not limited to the following: <br />Status of any development approvals within the study area <br />• Status of infrastructure improvements within the study area <br />SCHEDULE <br />We will provide our services as expeditiously as practicable with the goal of having the AUAR Update <br />adopted by City Council by August 2024. <br />