Laserfiche WebLink
<br /> CITY OF ARDEN HIL~S <br /> . Jjl~J0ARY l5 l 1990 <br /> Pi:\I~:: FOUR <br /> the more extensive the repairs prior to an overlay will become. <br /> Streets that are not repaired while their rating is in this range will <br /> eventually require reconstruction as their only alternative. <br /> D. 0-69. Reconstruction <br /> These are streets which are not worth the investment of rehabilitating <br /> and therefore neeo to be completely reconstructed. The causes of any <br /> problems which led to the poor condition of the street must also be <br /> addressed. The excavation of bad soils, placement of geotextile fabric <br /> or construction of storm sewer are all possible a9ditions that may be <br /> . necessary to try to make the reconstructed road last as long as <br /> Dossible. A,GCr2ss~ng I~,e prco:e:il ~ ::'5e1 F (peer rcacs) without <br /> addressing the cause of the problem (bad soils or excessive water) does <br /> not canstitut2 prudent use of money. <br /> Currently, the existing rating data, shown on Exhibit 2 reflects the <br /> following total estimated project costs for street work required within the <br /> ~ <br /> City (in 1990 dollars): <br /> - <br /> Seal Coating ~Ieeds $ 132,800 <br /> O'lerl ay tJeeds 586,300 <br /> Reconstruction Needs 968,800 <br /> TOTAL NEEDS $1,688,500 <br /> . <br />