Laserfiche WebLink
<br />. c. Tennis courts: <br /> 1 ) Air-supported structures (first phase). <br /> 2) Rock face block walls, break-off block banding, standing <br /> seam metal roof (final phase). <br /> 3) Color same as for racquet ball courts. <br /> 5. Conditions for approval (prior to issuance of building permits): <br /> a. That the two lots be combined and that appropriate easements <br /> be granted to the City, subject to administrative approval. <br /> b. That a permanent access easement across the C.O.C. drive be <br /> provided to the east parking lot. <br /> c. That revised drainage and grading plans be approved by the <br /> R.C.W.O. and City Engineer. <br /> d. That additional parking, if needed, will be provided either in <br /> a joint parking agreement with C.D.C. or constructed on the <br /> west lot. <br /> e. That City park dedication requirements be satisfied. <br />. <br /> Attachments: <br /> 1. Revised site and building plans <br /> 2. Developer clarification of issues raised throughout review process <br /> (14 pages) , <br />. <br /> TIQOo CASE #90-09 <br /> PAGE 4 OF 4 <br />