Laserfiche WebLink
<br /> ~ <br />Minutes of the Arden Hills Regular Council Meeting, 8-27-90 <br />Page 2 <br />STOWE AVE. (Cont'd) Mayor Sather advised he will be in attendance and . <br /> encouraged CoullcilInembers to participate. <br />Char wilmar thanked the Council for their time and attention. <br />PARKING ; Council was refe.:rred to a letter from Mr. & Mrs. Rudy <br />HARRIEr AVENUE Vierath, 1169 Benton way, dated 8-27-90, relative to <br /> parking problems on Harriet Avenue between Pine 'Iree <br />Drive and Lexington Avenue. <br />Mr. and Mrs. vierath did not appear at the meeting to address this matter. <br />After discussion, Council con=ed to direct staff to review the parking <br />problems along Harriet Avenue, contact the apartment manager and request tenants <br />be notified of the City parking re:ruirements and direct them to park in the <br />parking lot of the complex, and forward a letter to the Vierath's outlining steps <br />taken to resolve the problem. Council further requested staff report on this <br />matter at the next regular meeting. <br />CouncilInember Malone stated he ol:Berved parking on Grey Fox Road and requested <br />staff review the parking along this street. <br />Public Works SUperVisor Winkel advised both Grey Fox and Red Fox Road will be <br />posted with "no parking" signs in conjunction with the signalization of the two <br />intersections at Lexington Avenue. <br />Malone noted the parking problem continues further west of the intersection, near . <br />the Eastside Beverage building. <br />Council directed staff to review the parking problems on Grey Fox Road. <br />PUBLIC HEARING <br />OAK AVENUE; Mayor Sather opened the meeting at 7:40 p.m. for the <br />ASSESSMENTS, purpose of a public hearing on the proposed Assessment <br />IMPRVMl'. ST-89-2 for the oak Avenue storm Sewer Irrprovement No. ST-89-2. <br />Clerk Administrator Berger verified the publication of the Notice of Hearing in <br />the New BriMton Bulletin on Wednesday, August 8, 1990, and mailed to affected <br />property owners the same date. <br />Berger briefly outlined the history of the storm sewer installation on oak Avenue <br />and explained the project initially handled by the engineering firm of SElL <br />Mayor Sather referred to a letter from the =ent city Engineer Terry Maurer and <br />Engineer Mark Graham, dated 8-21-90, and asked Engineer Graham to review the <br />dis=epancies found in the assessment roll in tenus of benefitted property and <br />area to be assessed. <br />Engineer Graham explained that the firm of SEH prepared the preliminary <br />assessment roll for this project and the information was presented to the city <br />Council as part of a feasibility report for the initial public hearing on the . <br />proposed assessment roll. After review of the area, Graham found some <br />dis=epancies relating to the property area proposed to be assessed and the <br />actual area that contrirotes to storm water runoff. He outlined the discrepancies <br />for Council, as per the letter. <br />---- <br />