My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 01-13-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 01-13-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:44 PM
Creation date
11/3/2006 3:53:20 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />, <br /> CONSULTING ENGINEERS <br />. Maier Stewart & Associates Inc. <br /> January 8, 1992 <br /> File No: 520-029-20 <br /> Honorable Mayor and City Council <br /> City of Arden Hills <br /> 1450 W. Highway 96 <br /> Afton, MN 55112 <br /> RE: KEITHSON AREA POND IMPROVEMENTS REPORT <br /> ARDEN HILLS, MINNESOTA <br /> Dear Council Members: <br /> Please find attached a copy of the Keithson Area Storm Sewer Improvements <br /> Report. This report contains a design summary for the pond located along <br /> the west side of Keithson Drive, storm sewer pipe directing runoff to the <br />. south and a design summary for a pond to be located within an easement to be <br /> obtained from Mr. George Reiling. The report contains an easement <br /> description for Mr. Reiling's property, which City Attorney Jerry Filla is <br /> using in the City's condemnation proceedings. Construction plans have also <br /> been prepared for all work described in the report are attached. <br /> The report has been forwarded to the Rice Creek Watershed District for their <br /> review and consideration at their January 1992 Board Meeting. <br /> The estimated construction costs for the improvements are as follows: <br /> Keithson Pond Grading & Wier Construction $ 6.000 <br /> Reiling Property Pond Grading. Wier <br /> Construction & Storm Sewer Improvements 30 .1 00 <br /> Total Estimated Construction Cost $36,100 <br /> This project is on the January 13. 1992 City Council agenda for three <br /> reasons. The first reason is that we recommend bids be taken for the <br /> project as outlined by the Plans. This will allow the City to know firm <br /> numbers for the construction cost. In addition, a contractor may want to <br /> work in the Keithson Pond while the ground is frozen. We therefore. seek <br /> City Council authorization to seek bids for the work shown by the Plans. <br />. <br /> 1959 SLOAN PLACE, ST. PAUL, MINNESOTA 55117 612-774-6021 <br /> 9800 SHELARO PARKWAY, MINNEAPOLIS, MINNESOTA 55441 612-546-0432 Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.