The 2025 Park Improvement Project, as programmed in the 2024-2028 CIP, is only budgeted for <br />the replacement of the play structures, rehabilitation of the hardcourts and some miscellaneous <br />items that relate to the play structure or hardcourts or items that have been consistent in recent <br />past Park Improvement Projects. <br />Public Works Staff and PTRC have each performed site visits and listed feedback for potential <br />park improvements, in addition to the play structures and hardcourts and over and above what <br />had been budgeted for in the CIP, which was presented to Council at the March I I Work <br />Session. Council was interested in considering all of these items presented at that Work Session <br />and requested staff to go through the process of receiving feedback from Public outreach and <br />providing preliminary planning level cost estimates of these items prior to determining the final <br />scope of the project. <br />At the Work Session, City Council gave City Staff direction to direct select an engineering <br />consultant for professional services to take the project from start to finish. Tasks to include, but <br />not limited to, public engagement, public surveys, open houses, project management, design <br />coordination, Council presentations, vendor/contractor coordination, bidding assistance, <br />construction survey and construction observation. <br />Considering Council's desire to be flexible at the early stages of the project with the design and <br />the current broad scope of the project, Staff requested that Bolton and Menk, Inc. provide a <br />Professional Services Agreement (PSA) that only includes the following: complete online survey <br />development, public involvement, survey analysis, planning level cost estimates based on <br />feedback and a Public meeting presentation to Council. At the Council meeting, Council will <br />need to define the scope of the project which will lead the project into the design phase, and a <br />PSA amendment will be requested from Bolton & Menk related to that project scope. City Staff <br />recommends approval of the PSA with Bolton and Menk, Inc. as seen in Attachment B for the <br />Arden Oaks Park & Freeway Park Improvement Project. <br />Anticipated project schedule: <br />• April 2024: Project Kickoff and Online Survey Development <br />• April/May 2024: Perform and Complete Public Involvement Process <br />• May 2024: Finalize Online Survey Report <br />• May 28, 2024: Present Final Report findings at Work Session to Council <br />• June 2024: Take selected Scope of Work and Amend PSA for Design and Construction <br />• July/August 2024: Concept design with updated cost estimates, host Open -House event <br />• August/September 2024: PTRC and City Council involvement and final cost estimates <br />• Fall 2024: Lock in purchase of play equipment <br />• February/March 2025: Bid <br />• April 2025: Award construction contract <br />• Summer/Fall 2025: Construction <br />Budget Impact <br />Within the proposed 2024-2028 CIP Budget (Attachment A), the Arden Oaks Park & Freeway <br />Park Improvement Project has $460,000 total budgeted, as seen in the table below: <br />Page 2 of 3 <br />