My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-09-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 03-09-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:51 PM
Creation date
11/6/2006 2:38:43 PM
Metadata
Fields
Template:
General (2)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Minutes of the Arden Hills Regular Council Meeting, 2-10-92 <br /> Page 11 <br /> . STATUS REKlRI'; Council was referred to the Undeveloped Land Report <br /> UNDEVEIDPED I1\ND prepared by Planner Bergly. <br /> Council acJmowledged receipt of the annual report. <br /> . RES. #92-12; Council was referred to the Feasibility Report dated <br /> KEI'IHSON roND January 1992 and the letter from Eh:fineers Ten:y Maurer <br /> IMPROVEMENTS and Mark Graham dated 2-6-92, relative to the proposed <br /> Keithson Area Holding Pond Improvement/ <br /> Eh:fineer Graham explained the Feasibility Report was prepared, as directed by <br /> Council, to retain the city's option to assess property owners contribJ.ting <br /> runoff to the holding pond. He reported on the bid opening for the :improvement; <br /> six bids were received, with a low bid of $28,840 presented by Ryan Contracting, <br /> Inc. <br /> Graham advised the options available for consideration at this t:iJne are to either <br /> accept the bids and award the contract or seek additional information by <br /> scheduling the appropriate public hearings. <br /> Councilmernber Malone reconunended receipt of the feasibility report and scheduling <br /> the public hearings in order to retain all options available at this t:iJne. He <br /> commented that the easements must be acquired prior to construction of the pond. <br /> The Eh:fineer noted that the est:iJnated total project cost is based on the low bid <br /> plus overhead costs, however, it does not include easement acquisition costs for <br /> . the Reiling property. <br /> Acting Mayor Mahowald requested the City Atto:rney update the status of the <br /> easement acquisition. <br /> Atto:rney Filla reported the condemnation hearing in this mtter is scheduled on <br /> 2-14-92; the prelilTlinary appraisal of damages is $17,000.00. He explained the <br /> appraiser has included additional costs for the property owner's loss of <br /> flexibility to loc:ate the pond in another area if the site. <br /> Filla requested Council grant him authorization to indicate to the Commissioners <br /> that willingness of the city to stipulate a condition which allows the owner to <br /> reconfigure or reloc:ate the pond if necessary for development of the site, <br /> provided the pond capacity remains the same. <br /> Council concurred to direct the Atto:rney to offer the above contingency at the <br /> hearing. <br /> Acting Mayor Mahowald asked for questions from the fl=r. <br /> Dick Foster, 4527 Keithson Drive, expressed concern that the proposed project <br /> does not appear to alieviate the flooding on his property. He noted the high <br /> water level elevation established for the 100 year event appears high. Foster <br /> displayed a drawing which outlined the pond area prior to development of the <br /> Keithson Addition; noted the reconfiguration of the pond, as a=arrplished in <br /> . 1987. He explained that the elevation of the pond was initially 970.2 and that <br /> was changed to 969.5 when lDt 5 was split and combined to lDts 4 and 6 in the <br /> development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.