Laserfiche WebLink
<br /> . <br /> Pal!e 16A THE Rln"[;ETIN Wed.. May 6. 1992 <br /> CITY NEWS , ;~ <br /> City OKs Tiller Lane~project, <br /> liI~!II~I~llllliillll:llllliil . afford the 'a~sessment, while he l\!ld <br /> ! others in the 1300 block could n91. <br /> $278;000 road "We.re barely making our <br /> (mortgage) payments as is." <br /> by Mark Engebretson work will begin <br /> The $278,000 Tiller Lane road TERRY MAURER, c.ty <br /> project will proceed after all this this summer engineer, said that although TilIer <br /> summer. doesn't visually look in poor shape <br /> The Arden Hills City Council . in the 1300 block, he said <br /> OK'd the project 4-0 at its April 27 One man from the 1100 block structurally it is not sound and has <br /> meeting, two /Weeks after some on been rated for reconstruction. In \lis <br /> lhc council suggested that the said Tiller has "ooen terrible for 25 opinion; he said an overlay would <br /> project be delayed. years." , .. notsliffice. <br /> At the earlier meeting. some ,R~bert Emery, 1138 TIIl,er, saId, Overlays, generally, ~re <br /> . council' members considered 'Let s get It done and let s get n expected to extend a road's hfe <br /> postponing the Tiller project so the done now." . another fo'ur to 'seven yens. <br /> city could move ahead with two But some in the 130? block saId Reconstructions are expected to hist <br /> other road projects this summer - their end of the road IS III better a minimum of 20 years before an <br /> Round Lake Boulevard and Dunlap shape than the 1100 block and overlay is nceded. ~' <br /> Street. The council will consider doesn't need repair. And one added The council voted 4-0 to adopt <br /> I, those two' projects, which that residents in the 1300 block the assessment role and accept the <br /> , combined are estimated, to cost can't afford the assessment.. The low bid from F.M. Frattalone'. <br /> $150,000, at a later meeting. home owners will be assessed Council Member JoAnn Growe <br /> $29.38 per front foot for the was absent. The project wur <br /> A DIVIDED house attended project. Some advocated a less proceed this summer. ',' <br /> last week's public hearing at Arden expensive overlay for the 1300 ,The city will pick up $143,000 <br /> Hills City HalL Some, mostly those block instead. of the Tiller project cost and assess <br /> in the 1100 block of Tiller, favored "Our incomes, I wquld say, are the remaining $125,000. <br /> proceeding this year, while others, very, very different," saId Wayne <br /> those in the 1300 block; said the Bond, 1326 Tiller, who argued that <br /> project should be tabled, those li\(ing inthe~l00 bloc!fp()Hld, <br /> :'i~ <br /> . (!C.~hI <br /> '--1~Vi'(]W--~c <br /> 010 :J- <br />