Laserfiche WebLink
<br /> -- -----...- <br /> , , . <br />Arden Hills Council 2 June 29, 1992 . <br /> c. Acknowledge Receipt of Recruitment Procedures and <br /> Authorize Expenditure to The Brimeyer Group, <br /> Inc, - City Administrator Recruitment. <br /> d, Acknowledge Trade Name and Corporate officer <br /> Changes for On-Sale Licensee, Minneapolis Motel <br /> Enterprises, Inc, / dba Ramada Inn. <br /> e, Authorize Hiring Replacement Seasonal Employees. <br /> f. Approve List of Claims/payroll. <br />PUBLIC COMMENTS <br />There were no public comments. <br />PUBLIC HEARINGS <br />IMPROVEMENT HEARING FOR ARDEN PLACE <br />Mayor Sather opened the meeting at 7:36 p,m. for the purpose <br />of conducting a public hearing on Arden place Drainage <br />Improvement. Acting Clerk Administrator Iago verified <br />publication of the notice of hearing in the New Brighton <br />Bulletin on Wednesday, June 17 and 24, and mail ing to <br />affected property owners on June 17, 1992 , . <br />City Engineer Graham reported that in September, 1991, a <br />feasibility study and plans and specifications were prepared <br />to replace an existing drainage pipe that extends from the <br />low area behind 1553 Arden place to the south across Arden <br />Place, and between 1540 and 1548 Arden Place, He added that <br />the cost of the project was estimated at $20,800 (incl uding <br />the lowest construction bid of $16,675 and 25% overhead) , <br />He commented that the existing pipe does not appear to be <br />placed within an easement, but it may be legally possible to <br />claim a prescriptive easement so no easement acquisition <br />costs would apply, <br />Graham stated that questions were raised during october 1991 <br />public hearings on this project relative to easements, <br />placement of the pipe, cost, and water quality; which led to <br />further research of alternative options to address this <br />drainage issue. <br />Graham explained a second option is to install a pipe to the <br />Lake Johanna Beach Club property, at an estimated cost of <br />$30,000, This option would cost more than the original <br />option primarily due to the need for additional length of <br />pipe. Easement acquisition costs are unknown but Graham <br />expected a minimal cost, . <br />Graham's preference was the original option of a direct <br />route to Lake Johanna. <br />