Laserfiche WebLink
<br /> fVeAJ.J Or{JrJfUfJ KJUlfOT/fj <br /> Wed - 7/0/1Z <br /> - - <br /> . Tough negotiator .,~,....,-..,."... ' <br /> Arden Hills man calls foul; says city 'destroyed' his driveway <br /> />y Mark Engebretson accusing the city's consulting confrontation with.. Podlasek.> <br /> , Wbo says you can't fight city engineer of shortchanging bim on Nevertheless, Graham could not <br /> ball? the quality of that project. hide his frustration over the matter, <br /> . Though he basn't won anything But before adjourning for the <br /> yet, longtime , Arden Hills resident POD LASEK CLAIMS the evening, the council directed <br /> Francis Podlasek is finding gruff engineer lowered the elevation of Graham to get an estimate for the <br /> talk and persistent lobbying can the road in front of his house by up job of regrading the entire length of <br /> sometimes make a difference with to two feet, making for a steep Podlasek's dIiveway, about 98 feet. I <br /> , <br /> city council members. incline from the street up his <br /> Last year Podlasek, and others, driveway. Podlasek said the dirt GRAHAM HAS maintained <br /> almost convinced the city council from the two'foot cut was used as that the elevation was lowered only <br /> to withdraw its proposal to fill in other areas of the 'Project and six inches and was necessary to <br /> reconstruct the road in front of his was done to lower overall project provide a uniform street grade and <br /> house. In fact, the council pulled its costs. to match topography on both sides <br /> plans for the North Snelling The issue was discussed at the of the road. <br /> Avenue project, but later reversed June 29 city council meeting, and "That's a lie Mark," Podlasek <br /> itself. Podlasek and Qthers on the during the meeting Podlasek got said after Graham 'restatedthat at <br /> street paid a pretty penny when it hot, as he accused the engineer of the meeting. <br /> came time to fnnd their portion of lying. Mark Graham, the. engineer, <br /> the project - about $3,500 each. defended himself to the council, Driveway,.. . <br /> Now Podlasek is back and he's while carefully avoiding a direct continued on page 9A <br /> ~ ,1\ <br /> -.. .....lDrivewayICity may regrade- <br /> . continued from page 3A making the driveway level, as it <br /> . Graham said despite his was before the road reconstruction. . <br /> disagreement with Podlasek, he He estimated the dirt moving to . <br /> proposed last fall to regrade the cost between $2,000 and $3,000. <br /> fltst 40 feet of Podlasek'sdriveway Podlasek said he will pay,for the . <br /> anyway. Podlasek agreed, but later concrete and any additional base <br /> I refused, Graham says. i needed. ' <br /> . "W~'ve tried.t? effectively work "I'~ n~t,trying to rob anybody," <br /> With him ~nd It s com.e to this," . h~ ~~Id. I m only trying to be <br /> Graham SaId at the meeting, t farr. . <br /> "Why does this man have the ...i I <br /> right to destroy my driveway,"': A~ER A BRIEF discussion I <br /> countered Podlasek, who came In which some council members <br /> arm~d with before and after photos symp.athized with the problems <br /> of hIS driveway. associated with a steep driveway <br /> . ". Council Member ,D~le Hick~ <br /> . PODLASEK SAYS he changed ?Joved. to direct Graham to get the <br /> hiS mmd for. two reasons: one, he Job es~e. The council approved <br /> wants to IDstall a concrete the. motion 4-0. Council Member <br /> driveway instead of bituminous; Tom Mahowald wasabsenl., <br /> and two,.he wants the entire length _-, __:rhe issue likely will be back at <br /> of the driveway to be level. "Why th~ J~I~ 13 meeting, when the' <br /> do I have to accept less than what I .' council likely will vote ou whether <br /> ~ had?" ~e aske~ rhetorically about to pay for the regrading. <br /> the mchne, saymg he didn't want a <br /> "twoopitched driveway." <br /> , Podlasek said he only wants the <br /> city to pay for "moving dirt" and <br /> CC" Packer <br /> 7//0/Q,Z <br />