My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 03-30-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 03-30-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:57 PM
Creation date
11/6/2006 2:39:17 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> . CONSULTING ENGINEERS <br /> Maier Stewart & Associates Inc. <br /> ~1arch 25. 1992 <br /> File No: 520-028-30 <br /> Honorable Mayor and City Council <br /> City of Arden Hills <br /> 1450 W. Highway 96 <br /> Arden Hi 11 s. MN 55112 <br /> RE: 810 OPENING <br /> 1992 TILLER LANE STREET RECONSTRUCTION IMPROVEMENTS <br /> Dear Council Members: <br /> Bids were received and opened at 10:00 a.m. on March 19, 1992 for the above <br /> referenced project. A total of eleven bids were received. Foilowing is a <br /> list of the oidders and their bids. An itemized bid tabulation is also <br /> . attached. <br /> CONTRACTOR TOTAL BID <br /> F.M, Frattalone, Inc. $211,105.00 <br /> Schifsky & Sons, Inc. $ 212 , 123 . 00 <br /> Midwest Asphalt, Inc. $219,773.75 <br /> Tower Asphalt, Inc. $221,202.00 <br /> Ashbach Construction Co. $222,662.40 <br /> GMH Asphalt Corp. $227,476.QO <br /> W.B. Miller, Inc. $239,400.00 <br /> Valley Paving, Inc. $245.747.65 <br /> Northwest Asphalt, Inc. $247,669.00 <br /> Alber Construction, Inc, $248,864.00 <br /> Hardri ves, Inc. $274,052,00 <br /> The feasibility study presented in November 1991 estimated the construction <br /> cost of the Tiller Lane Street Improvement project to be $189,400. Following <br /> preparation of the plans and specifications and soil boring investigation, we <br /> estimated the construction cost to be $255,300 due to increased soil <br /> correction costs associated with the underlying unsuitable native soils. <br /> This revised estimate was presented at the February 10, 1992 public hearing. <br /> The low bid received was approximately 17% below the estimated construction <br /> costs presented at the public hearing. <br /> . <br /> 1959 SLOAN PLACE, ST. PAUL, MINNESOTA 55117 612.774.6021 <br /> 9800 SHELARO PARKWAY, MINNEAPOLIS, MINNESOTA 55441 612.546.{)432 Equal Opportunity Employer <br />
The URL can be used to link to this page
Your browser does not support the video tag.