Laserfiche WebLink
<br /> . CONSULTING ENGINEERS <br /> Maier Stewart & Associates Inc. <br /> ~1arch 25, 1992 <br /> File No: 520-028-30 <br /> Honorable Mayor and City Council <br /> City of Arden Hills <br /> 1450 W. Highway 96 <br /> Arden Hi 11 s, MN 55112 <br /> RE: BID OPENING <br /> 1992 TILLER LANE STREET RECONSTRUCTION IMPROVEMENTS <br /> Dear Council Members: <br /> Bids were received and opened at 10:00 a.m. on March 19, 1992 for the above <br /> referenced project. A total of eleven bids were received. Foi10wing is a <br /> list of the bidders and their bids. An itemized bid tabulation is also <br /> . attached. <br /> CONTRACTOR TOTAL BID <br /> F.M. Frattalone, Inc. $211,105.00 <br /> Schifsky & Sons. Inc. $212,123.00 <br /> Midwest Asphalt. Inc. $219,773.75 <br /> Tower Asphalt. Inc. $221.202.00 <br /> Ashbach Construction Co. $222,662.40 <br /> GMH Asphalt Corp. $227,476.00 <br /> Vi.B. Miller, Inc. $239,400.00 <br /> Valley Paving. Inc. $245,747.65 <br /> Northwest Asphalt, Inc. $247,669.00 <br /> Alber Construction, Inc. $248,864.00 <br /> Hardrives, Inc. $274,052.00 <br /> The feasibility study presented in November 1991 estimated the construction <br /> cost of the Tiller Lane Street Improvement project to be $189.400. Following <br /> preparation of the plans and specifications and soil boring investigation. we <br /> estimated the construction cost to be $255,300 due to increased soil <br /> correction costs associated with the underlying unsuitable native soils. <br /> This revised estimate was presented at the February 10, 1992 public hearing. <br /> The low bid received was approximately 17% below the estimated construction <br /> costs presented at the public hearing. <br /> . <br /> 1959 SLOAN PLACE, ST PAUL, MINNESOTA 55117 612-774-6021 <br /> 9800 SHELARD PARKWAY, MINNEAPOLIS, MINNESOTA 55441 612-546-0432 Equal Opportunity Employer <br />