My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-13-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 04-13-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:08:58 PM
Creation date
11/6/2006 2:39:23 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> I <br /> .. A drainage permit will be required from the Minnesota Department of Transportation allowing <br /> storm water runoff to be formally directed toward the I-35W right-of-way. In addition, plans will <br /> I be submitted to the Rice Creek Watershed District to determine if a permit will be required. <br /> I ESTIMATED COSTS <br /> I The estimated construction and project costs for Options 1 and 3 to improve Round Lake Road <br /> I West are provided in the following tables. Option 2 has been discounted as not being feasible and <br /> therefore, no costs have been estimated for it. <br /> I The estimated construction costs are based on actual bids taken this year on Tiller Lane and on <br /> I projects in surrounding communities. Estimated costs for recycling the existing pavement area <br /> based on data received from Ramsey County based on projects completed in 1991 and planned in <br /> I 1992. <br /> , The estimated project costs include overhead costs equal to 32 % of the construction cost as <br /> I detailed by the City's Assessment Manual. This overhead cost includes City Administration, <br /> engineering design, construction inspection and staking, fiscal and legal costs. <br /> I <br /> I TABLE 1 <br /> ESTIMATED PROJECT COST <br /> I OPTION 1 - RECONSTRUCTION OF ROUND LAKE ROAD WEST <br /> Estimated Street Improvement Cost $253,700 <br /> I Estimated Storm Sewer Cost 125.300 <br /> I Estimated Construction Cost $279,000 <br /> Administration, Engineering, Fiscal (32 %) 189.300 <br /> Estimated Total Project Cost $368,300 <br /> 9 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.