Laserfiche WebLink
<br /> -.--.---- <br />pl' .. MeetiDq 2 11-04-92 , <br />.n'ft''''9' n.....'''S1OD . <br />PUBLIC IIE1lRI!G - Cl\SE #92-17: REZCIIIlG AND PLl\NNED UNIT ~. CLE\1ELl\NI) <br />AV!2IllE. JCIDlllRXELL (oonHm".,ll <br />2. Rerluction in Parki.n;J Requirements: '!he Applicant ~. ~ses 60 ,. <br /> garage stalls and 30 exterior spaces, and possible additional <br /> spaces could be available in the green area located on both sides <br /> of the drive. <br />3. '!he I.ard;cape Plan shcx.1s a good mix of trees, shrubs and planting <br /> beds for annuals and perennials. Flower beds will allow the <br /> residents to be involved in the gardening. Mr. Bergly suggests <br /> the developer consider a surfaced outdoor congregating space in <br /> one of the two =tyards. <br />4. Lighting: About 20 pole lighting fixtures are distributed alon;r <br /> the drives and parki.n;J areas at about 30' to 40' spacing. <br />'!he Planner summarized the project data on page 2 of his :re~LL. <br />Planner Bergly recclllIIIlE!lled the following actions: <br /> L '!hat the Moratorium Ordinance be waived. <br /> 2. '!hat the 9 a=e site be rezoned from R-2 to R-3 at a density <br /> of 6.5 units per a=e as allowed in the proposed Zoning <br /> Ordinance . <br /> 3. '!hat the PUD General Developnent Plan and Final Plan be <br /> approved as proposed with the following conditions: <br /> a. 'lhat a parki.n;J ratio of 1 garage space and .5 outside <br /> spaces be provided for each unit and that .5 spaces <br /> per unit (30) be approved as "proof of parki.n;J" to be . <br /> constructed at such time as the City determines that <br /> the need for such additional parki.n;J is evident. <br /> b. 'lhat the water management plan be approved by RaID, <br /> DNR and U.S. Corps of Engineers and that copies of any <br /> required pennits be filed with the city. Measures to <br /> ilrprove the water quality in the existing pon:i should <br /> be investigated in conjunction with these pennits. <br /> c. '!hat site construction plans be approved as part of <br /> the Developnent Agreement with the City. <br /> d. '!hat fire hydrants be located as required by the <br /> Fire Marshall. <br /> e. '!hat Park Dedication requirements be stipulated in <br /> the Developnent Agreement. <br /> f. 'lhat appropriate l:x:>nding for landscaping and costs <br /> associated with City review and inspection be <br /> stipulated in the Development Agreement and that an <br /> escrow a=unt be established to cover such costs. <br /> g. 'lhat the sign location shown is not approved. <br />vice Clair winiecki asked if there were any questions or camments from <br />the Conunission. <br />Carlson questioned the soil stability and if any co=ections were <br />anticipated. '!he Architect, for the Applicant, Frank Reese, stated Braun <br />Engineering has provided soil tests and there are no co=ections . <br />anticipated for brilding construction. <br />