My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 11-09-1992
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
1990-1999
>
1992
>
CCP 11-09-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2007 1:09:16 PM
Creation date
11/6/2006 2:40:39 PM
Metadata
Fields
Template:
General (2)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />': ;. <br /> <br />12. PllyllcaJ Imp_ on W_ RaoUICM WiD the project involve the physical or hydrologic aIleration Cdredglng. fiI!Ing. ~ dIwI8km. <br />oulfall structure. dlIcing. Impouncbnent) of any ourface water (lake, pond. wetland, IIIre8m" drainage dIIclI)? 11!!1 Yet .0 No <br />If yes, Identify the water resource to be affected and deScribe: the alteration, including the construction process; volumes of <br />c1reclged or fI1l material; area affected; length of stJeam divenion; water surface area affected; timing and extent of fiuctuatlcma <br />. in ,water surface e1evations; spoils disposal sites; and proposed mitigation ml!8Sures to minimize Impacts, <br /> <br />'See. A~ <br /> <br /> <br /> <br /> <br />13. WI1Ir U.. <br /> <br />L Will the project involve the installation or abandonment of any wells? 0 Yet l!1. No <br />For abandoned we1Is give the location and Unique well number, For new wells, or other previously unpennitted we1Is, give <br />the location and purpose of the well and the Unique well number (if Imown), <br /> <br /> <br /> <br />b. Will the project require an appropriation of ground or surface water (incluc1lng dewateringl? 0 Yes II No <br />If yes, Indicate the source, quantity, duration, purpose of the appropriation, and ONR water appropriation permit number of <br />any existing appropriation, Discuss the Impact of the appropriation on ground water leveJs, <br /> <br /> <br /> <br /> <br />C. Will the project require connection to a public water supply? ~ Y.. 0 No <br />If yes, id~ the supply, the ONR water appropriation permit number of the supply, and the quantity to be used, <br />"5EE A.1Tp.,cIH~9 <br /> <br /> <br /> <br />14. Watar.relalld LInd lIMllanagement D1atrlclll Does any part of the project site involve a shoreIand zoning district. a delineated l00fmr <br />. flood plain, or a state or federally designated wild or scenic river land use district? 0 Yet & No <br />If yos, identify the district and cIiscuss the CXlII\patIbility of the project with the land use restrictions of the dlstrict. <br /> <br /> <br /> <br /> <br />15. W.tar Surface U.. Will the project change the number or type of watercraft on any water body? 0 Yet 'l(I No <br />If yes, indicate the current and projected watercraft usage and discuss any potential oven:rowc11ng or conflicts with other users <br />or fish and wildIife resoura!$, <br /> <br /> <br /> <br /> <br />16. SoIla Approximate depth (in feet) to: I ~ 0 I <br />Ground water: minimum \ 'l- average t Z. Iledroclc minimum ~ average' <br />Describe the soils on the site, giving SCS classifications, if known, (SCS inlelpn!lations and soU boring logs need not be attached,) <br />SEIO A7T"AC~aD <br /> <br /> <br /> <br /> <br />17. ellllion and Sldlmentation , Give the acreage to be graded or excavated and the cubic yards of soU to be moved: <br />acres 3 ; cubic yard. 10,000. <br />Describe any steep slopes or highly erodible soils and identify them on the site map. <br />Describe the ero.ion and sedimentation measures to be used during and after construction of the project. <br />. ,-:.e MrA::HEP <br /> <br /> <br /> <br /> <br /> <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.