Laserfiche WebLink
<br />. <br /> RCWD Comments <br /> October 2, 1992 <br />. Page Three <br /> Dave Kreisel. He can be reached at 633-5676. The Building Inspector will refer <br /> questions to the City Engineer when appropriate. <br /> Groundwater Protection: <br /> The City will forward any information it has regarding appropriation of ground- <br /> water for heating and cooling purposes. Since these appropriations are regulated <br /> by state permits, the City has not developed an inventory of the usage in Arden <br /> Hills. We suggest that the RCWD acquire this information directly from the State. <br /> Other Comments: <br /> We look forward to receiving a copy of the RCWD projects for the Long Lake <br /> chain of lakes. Arden Hills agrees that maintenance of those projects should <br /> remain in the watershed district jurisdiction. <br /> The beaver problems, at Valentine Lake, were referenced as a documented health <br /> problem associated with an incident where a maintenance worker became ill after <br /> working near and in the lake. The annual inspection of the drainage system <br /> should include inspection of the outlet from Valentine Lake. Removal of the <br /> material blocking the drainage ditches may be necessary. The DNR has trapped <br />. and removed beaver from areas near this outlet in the past. <br /> MSA, Inc. and the City of Arden Hills await additional clarification from the RCWD. <br /> Very truly yours, <br /> MAIER STEWART & ASSOCIATES, INC. <br /> f~~~ ~ <br /> Patricia A. Arlig, P.E. <br /> Environmental Engineer <br /> /~til%i~ <br /> Brian D. Miller, P.E. <br /> Project Engineer <br /> PAA:bs <br /> cc: RCWD <br /> 3585 Lexington Avenue North <br /> Arden Hills, MN 55126-8016 <br /> Cathy lago, City of Arden Hills <br />. <br />