Laserfiche WebLink
<br /> . City of Arden Hills <br /> December 15, 1992 <br /> Page 2 <br /> ALTERNATE n: <br /> Original design except that the vehicle maintenance/storage/office building area is reduced by 10%. <br /> Site Work: $392,000 <br /> Salt/Cold Storage Building: $250,000 <br /> V.M. Building and Comn<ments: $1A32.000 (reduced by $91,000 and 2,910 square feet) <br /> Total: $2,074,000 <br /> Comments: This is a fair, r<'J2SOtUlble option with rmly minor impactrm the project. <br /> AL TERNA TE 112: <br /> Original design except that both the vehicle maintenance/storage/office and the cold/salt storage <br /> buildings are reduced by 10%. <br /> Site Work: $392,000 <br /> Salt/Cold Storage Building: $225,000 (reduced by $25,000 and 1,000 square feet) <br /> . V.M. Building and Components: $1,432.000 (reduced by $91,000 and 2,190 square feet) <br /> Total: $2,049,000 <br /> Comments: The construction of salt/cold storage space is reliltively inexpensive when buill as a part of a <br /> larger building program. The savings of $25,000 does wt offset the value of the space/benefits. <br /> We recommend wtto consider this option. <br /> ALTERNATE #3: <br /> Original design except that the vehicle maintenance/storage/office is reduced by about 15%, or half <br /> of the proposed projected growth. <br /> Site Work: $392,000 <br /> Cold Storage Building $250,000 <br /> V.M. Building and Components: $1.389 .000 (reduced by $136,200 and 3,285 square feet) <br /> Total $2,031,000 <br /> Comments: Similar to Alternative #1, this alternate is still a good compromise, allurping for some <br /> expansion. <br /> . <br />