Laserfiche WebLink
<br /> . City of Arden Hills <br /> December 15, 1992 <br /> Page 3 <br /> ALTERNATE H: <br /> Original program and new site but the vehicle maintenance/storage/office building is built out of <br /> a metal building system (i.e. a "Butler" building) in lieu of precast concrete and masonry. <br /> Site Work: $392,000 <br /> Cold Storage Building $250,000 <br /> Y.M. Buildine: and Comoonents: $1.160.000 (same area reduced in price by $229,(00) <br /> Total $1,802,000 <br /> Comments: There is a reasonable savings by going with this option. The majur dTllWba4k is whether the <br /> City is willing /0 accept the aesthetic, and understands that the building will oot be as flexible <br /> ur solid. <br /> ALTERNATE #5: <br /> Original program but modify the existing building into cold storage and miscellaneous storage, build <br /> new salt storage building, build addition next to existing building and make all site improvements. <br /> . In addition, reduce the vehicle maintenance/storage/office by 10%. Also make minor improvements <br /> to existing building (e.g. repair roof, walls, cracks, etc.). <br /> Site Work: $174,000 (savings of $218,000) <br /> Renovated Building/Storage: $80,000 <br /> Salt Storage: $120,000 <br /> New Y.M. Buildine:/ Addition: $1,351,000 (reduced by $172,000 and 2,190 square feet) <br /> Total $1,725,000 <br /> Comments: The construction process will be lIWTe cmnpliazted, the public works department will have to <br /> operate during construction (and must count on addititmaI dust, noise, inconvenience, dc.), <br /> and there will be some down time in telecommunications, eleetriazl service, sturage, gas service <br /> and other services. If this is all acceptable, if additional growth on the site is oot required <br /> and/or the city hall azn relocate the existing site, and if the existing site is oot as valWlble for <br /> other purposes, then this is a money saving option. <br /> . <br />