Laserfiche WebLink
<br /> . <br /> . City of Arden Hills <br /> December 15, 1992 <br /> Page 4 <br /> ALTERNATE 116: <br /> Do not follow the program, build salt storage shed, replace buried tanks, build a cold storage <br /> building to accommodate many of the vehicles that would have been placed in heated storage, <br /> perform repairs to the existing building, comply with ADA and current codes, and do some minor <br /> interior improvements. <br /> Site Work: $150,000 <br /> Salt Storage: $120,000 <br /> Cold Storage: $330,000 <br /> Building Improvements: $130.000 <br /> Total $730,000 <br /> Comments: This option will do little to change operations and services, as the work included is mainly to <br /> bring the building up to code and add some additiDt14l cold and salt storage. We should be <br /> able to store about twelve to fifteen vehicles and all of the utility and park storage equipment. <br /> Thus, while cramped, we should have allTWSt all vehicles under cover with about one-third in <br /> heated space. <br /> . We can explore additional alternatives and go into more detail at your direction. The above should give <br /> you a better perspective of some possibilities. Regardless of the alternative, it would not be prudent to <br /> build a structure with only enough space to meets todays needs. Ukewise, if a new building is desired, <br /> features such as lifts, hoists and other servicing components should be a part of the design unless they <br /> can be simply added later. <br /> We shall be prepared to discuss this in more detail at the Monday Council Meeting. Please bear in mind <br /> that the above alternates do have many design implications, some of which we may not even be aware <br /> of without an actual drawing of layout <br /> /y <br /> cc. Denny Probst <br /> 1568.201 <br /> . <br /> -------.----- <br />