Laserfiche WebLink
BRAUN <br />Project Proposal <br />I NTERTEC <br />QTB191906 <br />The science You Build on. <br />City of Arden Hills - 2024 PMP Street & Utility Improvements <br />Client: <br />Work Site Address: Service Description: <br />City of Arden Hills <br />Various Streets from Snelling Ave N to Hamline Ave Construction Materials Testing <br />David Swearingen <br />N and Hwy 10 to Co Rd 96 W City Project Number: PW-24-0100 <br />1245 W Hwy 96 <br />Arden Hills, MN 55112 <br />Arden Hills, MN 55112 <br />651.792.7800 <br />Description <br />Quantity Units <br />Unit Price <br />Extension <br />Phase 1 <br />Construction Materials Testing - Base Bid <br />Activity 1.1 <br />Soil Testing <br />$4,572.00 <br />207 <br />Compaction Testing - Nuclear <br />15.00 Hour <br />94.00 <br />$1,410.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Utility Backfill - Storm Sewer & Watermain <br />6.00 Trips <br />2.50 <br />15.00 <br />1308 <br />Nuclear moisture -density meter charge, per hour <br />15.00 Each <br />28.00 <br />$420.00 <br />1861 <br />CMT Trip Charge <br />10.00 Each <br />50.00 <br />$500.00 <br />1228 <br />Topsoil Testing with nutrients, per sample <br />1.00 Each <br />410.00 <br />$410.00 <br />209 <br />Sample pick-up <br />6.00 Hour <br />94.00 <br />$564.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Full Depth Reclamation - Roadway <br />3.00 Trips <br />1.50 <br />4.50 <br />Topsoil <br />1.00 Trips <br />1.50 <br />1.50 <br />1318 <br />Moisture Density Relationship (Proctor) <br />4.00 Each <br />200.00 <br />$800.00 <br />1162 <br />Sieve Analysis with 200 wash, per sample <br />3.00 Each <br />156.00 <br />$468.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Full Depth Reclamation - Roadway <br />3.00 Each <br />1.00 <br />3.00 <br />Activity 1.2 <br />Concrete Testing <br />$8,478.00 <br />261 <br />Concrete Testing <br />45.00 Hour <br />94.00 <br />$4,230.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Curb and Gutter <br />9.00 Trips <br />2.50 <br />22.50 <br />Flatwork - Sidewalk & Driveway <br />3.00 Trips <br />2.50 <br />7.50 <br />Grout - Stormsewer & Catch Basin <br />6.00 Trips <br />2.50 <br />15.00 <br />1861 <br />CMT Trip Charge <br />27.00 Each <br />50.00 <br />$1,350.00 <br />1364 <br />Compressive strength of concrete cylinders, per specimen <br />54.00 Each <br />38.00 <br />$2,052.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Curb and Gutter <br />9.00 Sets <br />3.00 <br />27.00 <br />Flatwork - Sidewalk & Driveway <br />3.00 Sets <br />3.00 <br />9.00 <br />Grout - Stormsewer & Catch Basin <br />6.00 Sets <br />3.00 <br />18.00 <br />278 <br />Concrete Cylinder Pick up <br />9.00 Hour <br />94.00 <br />$846.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />_ Concrete Cylinder Pickup <br />9.00 Trips <br />1.00 <br />9.00 <br />Activity 1.3 <br />_ Pavement Testing <br />$5,908.00 <br />1530 <br />Asphalt Content, per sample <br />7.00 Each <br />162.00 <br />$1,134.00 <br />209 <br />Sample pick-up <br />14.00 Hour <br />94.00 <br />$1,316.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Bituminous Mixture Sample Pickup <br />7.00 Trips <br />2.00 <br />14.00 <br />l 532 <br />Extracted Aggregate Gradation, per sample <br />7.00 Each <br />114.00 <br />$798.00 <br />221 <br />Mark and Observe Contractor Coring <br />9.00 Hour <br />120.00 <br />$1,080.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Mark & Observe Bituminous Coring <br />3.00 Trips <br />3.00 <br />9.00 <br />03/01/2024 12:25 PM Page 1 of 3 <br />