My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
04-22-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:28:10 AM
Creation date
4/19/2024 9:25:38 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRAUN Project Proposal <br />I NTERTEC QTB191906 <br />The science You suiidOn. City of Arden Hills - 2024 PMP Street & Utility Improvements <br />1542 Thickness and Density of Bituminous Core 18.00 Each 60.00 $1,080.00 <br />1861 CMT Trip Charge _ 10.00 Each 50.00 $500.00 <br />Activity 1.4 Project Management $2,610.00 <br />226 Project Manager 10.00 Hour 174.00 $1,740.00 <br />22g Senior Project Manager 2.00 Hour 200.00 $400.00 <br />23g Project Assistant 5.00 Hour 94.00 $470.00 <br />Phase 1 Total: $21,568.00 <br />Phase 2 <br />Alternate #1 - Trails, ADA & Retaining Wall Impts <br />Activity 2.1 <br />Soil Testing <br />$2,113.00 <br />209 <br />Sample pick-up <br />4.50 Hour <br />94.00 <br />$423.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Aggregate Base - Trail <br />2.00 Trips <br />1.50 <br />3.00 <br />Retaining Wall Backfill <br />1.00 Trips <br />1.50 <br />1.50 <br />1318 <br />Moisture Density Relationship (Standard), per sample <br />1.00 Each <br />200.00 <br />$200.00 <br />1162 <br />Sieve Analysis with 200 wash, per sample <br />3.00 Each <br />156.00 <br />$468.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Aggregate Base - Trail <br />2.00 Each <br />1.00 <br />2.00 <br />Retaining Wall Backfill <br />1.00 Each <br />1.00 <br />1.00 <br />1861 <br />CMT Trip Charge <br />5.00 Each <br />50.00 <br />$250.00 <br />1530AG <br />Asphalt Content of Aggregate Base, per sample <br />1.00 Each <br />162.00 <br />$162.00 <br />207 <br />Compaction Testing - Nuclear <br />5.00 Hour <br />94.00 <br />$470.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Retaining Wall Backfill <br />2.00 Trips <br />2.50 <br />5.00 <br />1308 <br />Nuclear moisture -density meter charge, per hour <br />5.00 Each <br />28.00 <br />$140.00 <br />Activity 2.2 <br />Concrete Testing <br />$1,485.00 <br />261 <br />Concrete Testing <br />7.50 Hour <br />94.00 <br />$705.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Curb and Gutter <br />2.00 Trips <br />2.50 <br />5.00 <br />Flatwork - Sidewalk <br />1.00 Trips <br />2.50 <br />2.50 <br />1861 <br />CMT Trip Charge <br />5.00 Each <br />50.00 <br />$250.00 <br />1364 <br />Compressive strength of concrete cylinders, per specimen <br />9.00 Each <br />38.00 <br />$342.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Curb and Gutter <br />2.00 Sets <br />3.00 <br />6.00 <br />Flatwork - Sidewalk <br />1.00 Sets <br />3.00 <br />3.00 <br />27g <br />Concrete Cylinder Pick up <br />2.00 Hour <br />94.00 <br />$188.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Concrete Cylinder Pickup <br />2.00 Trips <br />1.00 <br />2.00 <br />Activity 2.3 <br />Pavement Testing <br />$514.00 <br />209 <br />Sample pick-up <br />2.00 Hour <br />94.00 <br />$188.00 <br />Work Activity Detail <br />Qty Units <br />Hrs/Unit <br />Extension <br />Bituminous Mixture Sample Pickup <br />1.00 Trips <br />2.00 <br />2.00 <br />1861 <br />CMT Trip Charge <br />1.00 Each <br />50.00 <br />$50.00 <br />1530 <br />Asphalt Content, per sample <br />1.00 Each <br />162.00 <br />$162.00 <br />1532 <br />Extracted Aggregate Gradation, per sample <br />1.00 Each <br />114.00 <br />$114.00 <br />Activity 2.4 <br />Project Management <br />$642.00 <br />226 <br />Project Manager <br />2.00 Hour 174.00 <br />$348.00 <br />228 <br />Senior Project Manager <br />1.00 Hour <br />200.00 <br />$200.00 <br />238 <br />Project Assistant <br />1.00 Hour <br />94.00 <br />$94.00 <br />03/01 /2024 12:25 PM Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.