My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-22-24-R
ArdenHills
>
Administration
>
City Council
>
City Council Packets
>
2020-2029
>
2024
>
04-22-24-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2024 9:28:10 AM
Creation date
4/19/2024 9:25:38 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Arden Hills <br />Proposal QTB191906 <br />March 1, 2024 <br />Page 3 <br />Measure and report the compressive strength of the concrete test cylinders for compliance <br />with the project documents. A set of three cylinders will be tested at 28 days for each set <br />cast. If field cure cylinders are requested, each additional cylinder will be charged at the unit <br />price listed in our cost estimate. <br />Bituminous Related Services <br />■ Sample and test bituminous pavement materials for compliance with the project documents. <br />This task includes asphalt content and extracted aggregate gradation tests of the bituminous. <br />■ Obtain cores and measure the thickness and density of the compacted non -wear bituminous <br />pavement by the core method for compliance with the project documents. We assume the <br />bituminous contractor will cut the cores. <br />Consulting, Project Communication and Reporting Services <br />■ Project management, including scheduling of our field personnel. <br />■ Review test reports and communicating with you and the parties you may designate such as <br />the project contractor(s), and other project team members, as needed. <br />■ Transmit test results to the project team on a weekly basis. <br />Scope of Services — Alternate #1- Trails, ADA and Retaining Wall Improvements <br />As laid out by the project plans, we have broken out additional testing for Alternate #1. Below is our <br />scope of services for the construction under Alternate #1 in the bid plans. <br />Services are performed under the direction of a licensed professional engineer. Testing services will be <br />performed on an on -call, as -needed basis as requested and scheduled by you or your on -site project <br />representative. After reviewing available information to determine compliance with project plans and/or <br />specifications and other design or construction documents, our scope of services for the project will be <br />limited to the tasks defined below. <br />Soil Related Services <br />Measure the in -place dry density, moisture content and relative compaction of fill placed for <br />retaining wall backfill for compliance with the project documents. This task includes <br />performing laboratory Proctor tests to provide maximum dry densities from which the <br />relative compaction of fill can be determined, as well as the use of a nuclear density gauge to <br />measure in -place dry densities and moisture contents. <br />■ Sample and test aggregate base and retaining wall materials for compliance with the project <br />documents. This task includes laboratory gradation testing of aggregate base material. <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.