Laserfiche WebLink
City of Arden Hills <br />Proposal QTB191906 <br />March 1, 2024 <br />Page 2 <br />retaining wall. We have provided a break out of our base bid and bid Alternate #1 for the trail, ADA and <br />Retaining Wall improvements to reflect the plans and bid documents. <br />Available Project Information <br />This proposal was prepared using the following documents and information. <br />■ Project plans and specifications prepared by Bolton & Menk, Inc., dated February 12, 2024. <br />■ A Pavement Evaluation Report prepared by Braun Intertec Corporation, dated June 23, 2022. <br />■ Addendum #1 to the Pavement Evaluation Report, prepared by Braun Intertec Corporation <br />dated April 20, 2023. <br />■ A Sediment Sampling Report, prepared by Braun Intertec Corporation dated, May 9, 2023. <br />■ Discussions with Brad Fisher with Bolton & Menk, Inc. regarding scope of services to be <br />requested, materials testing rates and requirements, as well as materials to be used behind <br />as retaining wall backfill. <br />Scope of Services — Base Bid <br />Services are performed under the direction of a licensed professional engineer. Testing services will be <br />performed on an on -call, as -needed basis as requested and scheduled by you or your on -site project <br />representative. After reviewing available information to determine compliance with project plans and/or <br />specifications and other design or construction documents, our scope of services for the project will be <br />limited to the tasks defined below. <br />Soil Related Services <br />Measure the in -place dry density, moisture content and relative compaction of fill placed for <br />utility backfill for compliance with the project documents. This task includes performing <br />laboratory Proctor tests to provide maximum dry densities from which the relative <br />compaction of fill can be determined, as well as the use of a nuclear density gauge to <br />measure in -place dry densities and moisture contents. <br />Sample and test Full Depth Reclamation materials for compliance with the project <br />documents. This task includes laboratory gradation testing of the full depth material. <br />Concrete Related Services <br />Sample and test fresh concrete associated with pavement and/or curb -and -gutter for <br />compliance with the project documents and cast test cylinders for laboratory compressive <br />strength testing. We assume that we will be able to appropriately dispose of excess concrete <br />(and associated wash water) on site at no additional cost to us. <br />BRAUN <br />INTERTEC <br />